SECTOR | UTILITIES, TRENCHLESS – BTS MEETING
glaciofluvial deposits, river terrace deposits, and till. Consequently, engineers encountered variable ground conditions, ranging from silty clays to sands and gravels, often accompanied by high groundwater levels. The prevalence of made ground, which resulted from
centuries of urban development, added further uncertainty, particularly including foundations, landfill and industrial land. In many locations the exact nature and thickness of these deposits remains unclear due to limited data. Construction access was another key consideration.
Preliminary vehicle tracking exercises were performed to assess routes through town and identified potential challenges associated with construction traffic, equipment deliveries, and future operational access. These evaluations helped define realistic compound requirements for both strategic and local interventions.
Above: Pipejack solution development.
overflows while improving overall network performance through focused capacity upgrades, storage provision, and sewer diversions. Given the size, interconnected nature, and operational complexity of the catchment, identifying the most effective solution required a highly structured, data-driven, and collaborative approach.
Geological and Buildability Considerations Detailed evaluations of geology were undertaken using desk studies, walkovers, records, and historic borehole data. Ground conditions across Shrewsbury consist of a variable depth of superficial deposits overlying bedrock of the Salop Formation and Kinnerton Sandstone Formation, comprising predominantly red-brown mudstones and sandstones. The superficial materials include alluvium,
Right Embodied Carbon Assessment.
14,000 12,000 10,000 8,000 6,000 4,000 2,000 0
Bored tunnel Shaft Right Direct costs ~35% reduction Tunnel Total Pipe jack
STRATEGIC TUNNEL OPTIONS Max described the original strategic concept developed under the PR24 framework by a previous consultant employed by Severn Trent Water. This proposal centred on a 2.85m ID segmentally-lined lined tunnel of approx 7km length from the most upstream CSO to Monkmoor Treatment Works. It would also include 18No shafts and approx. 4km of local upsizing works to connect existing sewers to the new system. As the revised optioneering design progressed, the
team undertook extensive route development activities. Key considerations included flood risk, access constraints, proximity to CSOs, interactions with existing infrastructure, construction logistics, and the positioning of shafts. Various alignments were examined and modified to avoid problematic locations such as bridges, flood-prone areas, and highly constrained urban spaces. The refined bored tunnel solution ultimately comprised
Bored tunnel Shaft Tunnel Total
Pipe jack
28 | November 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45