TRANSPORT – SINGLE VS TWIN TUNNELS | TECHNICAL


Figure 2: Roadway bored tunnel layouts.


By far the biggest chapters in Vol 2 are chapters 5


and 6 with lengths of 32 pages and 24 pages, respectively (see box panels).


ASSESSMENT AND EVALUATION The WG20 report begins, in both volumes, with historical context with note that following the Industrial Revolution there was wonder if multiple tunnels could achieve a desired transport outcome or if a single large-diameter tunnel might do so, if such constructions were even possible. It notes that the concept of a single large- diameter tunnel dates back more than 100 years to the early 20th Century and cites a proposal in the US to the Port Authority of New York and New Jersey, in 1919, for a 12.8m-diameter single traffic tunnel to run below the Hudson River, to be bored by a shield. It did not happen. Instead, the twin tube Holland Tunnel was built. But soon after in the US, although over in west


coast, in San Francisco, a large single tube tunnel was built – albeit excavated by drill and blast method. The relatively short tunnel originally took both road and rail traffic. Since then, gradually TBM technology has


advanced and many cities have had multiple bored tunnels constructed in varieties of ground conditions, especially in soft ground, and at increasingly larger diameters. The result is that twin tube projects have become the norm, enabling uni-directional travel in each tube. But as tunnelling technology has continued to develop so too have the TBM diameters kept increasing, raising possibilities of giant single spaces to hold all traffic needs, in multiple levels and/or partitioning. While possibilities multiply so do some


misconceptions in the discussions that look to weigh the merits of the alternatives, if not rivals: twin tubes or large single tunnels to achieve the cross section required? The report notes that some misunderstandings in planning and design that could negatively influence owners and planners, such as: ● ‘Bigger tunnels need to have deeper alignments with cover to the tunnel of at least 1.0 – 1.5 the diameter;’


● ‘A single bore transit tunnel is not safe for operation. If one track is out then the whole infrastructure is compromised;’ and


● ‘Very large TBMs can cause greater settlements compared to smaller TBMs, the smaller the better.’


Additionally, the report notes that awareness is


needed that while each of the twin tunnels may be smaller in size the configuration requires a range of additional smaller excavations which are, generally,


executed by a variety other tunnelling methods. “This extra work is very specialised and carried


risks,” the reports says, in aiming to establish a “transparent comparative approach” to consider the rival arrangements for transport tunnel projects. The report discusses use of a structured multi-


criteria approach for systematic evaluations the competitors. One such methodological framework, it says, is the Pugh Matrix, which is a qualitative technique that ranks options to a baseline using weightings in relation to relative importance of criteria. Still, the framework may be an approach but it is subjective, the report notes, which means that “the final decision generates complex and long discussions.” The debate is not over, the answer cleanly resolved,


in other words. Interestingly, it comments that what becomes the final solution, or choice, is usually what “offers greater confidence” and that in turn emerges from tradition and local conditions in the city and region of the proposed project. “Ultimately, the optimal solution will depend


on the balance between technical feasibility, operational performance, risk management and economic considerations.”


SINGLE BORE: OPPORTUNITIES AND CHALLENGES


Chapter 6 of the report discusses the opportunities and challenges of large single-bore tunnels through three stages: Planning & Design; Construction; and Service. Under each stage is discussed the opportunities and challenges, respectively, with focus given to a number of key points in each as shown in a table. Under the Challenges column of the table and against the Construction


stage are a number of entries, one of which is Higher Project Costs. The report says the risk of these costs “represents one of the most significant challenges in the delivery of large-diameter single-bore tunnel projects.” It adds that cost competitiveness with twin tube options is not guaranteed as it depends on a combination of factors that need to be addressed and actively managed from the outset. Also, there can be such a degree of variation between the cost of the same tunnel arrangement in different settings that those differences can be more than between different configurations. Project-specific solutions are key. More generally, single-bore solutions give benefits more from reducing or


consolidating ancillary works, depending on the scope for such. But early stage costs comparisons “are highly sensitive” to how well developed is the scope. Assessing options at equivalent levels of design development is vital and that there is explicit accounting for uncertainty and cost escalation over long programme timelines. Also, benchmarking as well as considering all disciplines involved – not only civils – are important for evaluating more fully the large single versus twin tubes question. It is not only about excavation.


November 2026


| 21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45