search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
which are rotten, we need to apply for planning permission from the local borough council. Currently IIMS is in discussion with the conservation planning officer at Fareham Council to seek the necessary permissions.


The scope of proposed renovation works and repairs to be undertaken at Murrills House is, in brief, as follows:


- Re-bed all hips and ridges on the east sides slated roof and inspect all valleys for damage.


THERE’S PLENTY OF BUILDING WORK TO DO AT MURRILLS HOUSE NOW THE INSTITUTE OWNS THE PROPERTY


As the Institute has finally taken ownership in recent weeks of Murrills House as its new flagship headquarters, the work to restore this magnificent Grade II listed, 500-year-old building to its former glory will begin shortly. Completion on the deal took far longer than was anticipated, but the outcome marks something of a triumph for the Institute. IIMS is soon to make a significant financial investment in essential maintenance and repair work which will only add to the value of this new asset.


Discussions have taken place with a local construction firm and the scope of work has been drawn up and agreed. The building survey threw up some key maintenance work that needs to be done with a degree of urgency, but nothing that was a major surprise to the team. Because the property is a Grade II listed building, it means for some items, such as replacement of the old wooden windows


- Any slipped and broken slates will be made good, replace all cracked and slipped clay tiles on the rear extension and repoint the ridge.


- Re connect the rear down pipe to run down the roof and into the guttering.


- Repair the cracks in the render on the front rounded elevation of the property.


- Supply and fit an ACCO drainage system to the east elevation along the tarmac footpath to take any surface water away from the building.


- Repair cracked soffit where soffit brackets are fixed, supply and fit 3 new vents to the extension soffits.


- Supply and fit a 200mm layer of quilted loft insulation to the 100mm of existing insulation. Spray all timbers in the loft with a wood boring insect treatment and rot treatment, supply and fit 4x vented roof tiles.


- Box Sash windows to be manufactured in joinery grade softwood timber with Sapele hardwood sill sections. All windows to match identical appearance and design as originals 4mm clear toughened glass face puttied into frames.


24 | The Report • September 2020 • Issue 93


Member News


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112