WHITE PAPER BY NATIONAL CARGO BUREAU CALLS FOR A NEW APPROACH TO ADDRESS CONTAINER FIRES
A white paper published by the National Cargo Bureau calls for urgent reform to stem the increasing number of container related incidents caused by poorly stowed, undeclared or misdeclared dangerous cargoes. This follows a recent inspection initiative that revealed an alarming number of containers with misdeclared dangerous cargoes that represent a serious safety risk.
Consequently, the National Cargo Bureau, the US inspection body for Dangerous Goods regulations, is calling for industry to adopt a comprehensive, holistic and coordinated approach to address this worrying trend. The inspection initiative also showed that 55% of containers were non-compliant with 43% failing to secure dangerous goods correctly within the container itself. Approximately 6.5% of containers carrying dangerous cargoes had been misdeclared.
It has been reported that, on average, a containership suffers a major fire every 60 days. However, in 2019, there were nine major containership fires, suggesting that the frequency of incidents is increasing. With more containers being carried and containerships getting bigger, risks are increasing in number, value and concentration.
Reasons may include: – the difficulty of supply chain stakeholders complying with a myriad of regulations; – a poor understanding of what constitutes a dangerous cargo and what is required to transport it; – the increasing complexity of multi-modal supply chains; carriers and ports restricting or refusing to move or receive certain dangerous cargoes;
– varied internal company challenges; and – the continuing threat of bad actors.
Hence, the National Cargo Bureau white paper specifically details 12 recommendations to ensure a safety culture for dangerous goods. These can be read in full in the white paper pdf at 
https://bit.ly/3faUpm2.
GEO THERM LTD PICKS UP LR AND ABS ACCREDITATION
Throughout the Covid-19 pandemic lockdown the team behind Geo Therm Ltd has actively sought to gain the coveted Lloyds Register (LR) and American Bureau of Shipping (ABS) approved service supplier status, bolstering its existing ISO 9001:2015, FPAL and Safe Contractor accreditations.
With the team was in lockdown, audit allocation and rechecking was undertaken online, ensuring all systems documents were current, fit for purpose and error free, while the actual LR and ABS audits being undertaken at Geo Therm Ltd’s premises in Reydon, Suffolk and the external auditors assessing equipment, certification, ISO quality document, procedures, training documentation, including equipment demonstrations much to the delight of their host company MD Tony Dale, (an IIMS Full member), extolling the virtues of each system albeit at a two metre distance.
With the successful LR service approval occurring in late February and the ABS recognised specialist accreditation occurring in late June, Geo Therm Ltd is now able to employ its latest raft of non-invasive inspection technologies to identify vessel deficiencies that, if left unchecked, can lead to electrical breakdowns, engine room fires and watertight integrity loss at hatch and door enclosures.
With LR and ABS approval, Geo Therm Ltd management confirms its continual professional service commitment in supporting its clients offshore drilling rigs, service operation vessels (SOV) and wind turbine jack-up barges, whenever and wherever commissioning, warranty or preventative maintenance needs are required, including Class approval.
14 | The Report • September 2020 • Issue 93
Marine News
            
Page 1  |  
Page 2  |  
Page 3  |  
Page 4  |  
Page 5  |  
Page 6  |  
Page 7  |  
Page 8  |  
Page 9  |  
Page 10  |  
Page 11  |  
Page 12  |  
Page 13  |  
Page 14  |  
Page 15  |  
Page 16  |  
Page 17  |  
Page 18  |  
Page 19  |  
Page 20  |  
Page 21  |  
Page 22  |  
Page 23  |  
Page 24  |  
Page 25  |  
Page 26  |  
Page 27  |  
Page 28  |  
Page 29  |  
Page 30  |  
Page 31  |  
Page 32  |  
Page 33  |  
Page 34  |  
Page 35  |  
Page 36  |  
Page 37  |  
Page 38  |  
Page 39  |  
Page 40  |  
Page 41  |  
Page 42  |  
Page 43  |  
Page 44  |  
Page 45  |  
Page 46  |  
Page 47  |  
Page 48  |  
Page 49  |  
Page 50  |  
Page 51  |  
Page 52  |  
Page 53  |  
Page 54  |  
Page 55  |  
Page 56  |  
Page 57  |  
Page 58  |  
Page 59  |  
Page 60  |  
Page 61  |  
Page 62  |  
Page 63  |  
Page 64  |  
Page 65  |  
Page 66  |  
Page 67  |  
Page 68  |  
Page 69  |  
Page 70  |  
Page 71  |  
Page 72  |  
Page 73  |  
Page 74  |  
Page 75  |  
Page 76  |  
Page 77  |  
Page 78  |  
Page 79  |  
Page 80  |  
Page 81  |  
Page 82  |  
Page 83  |  
Page 84  |  
Page 85  |  
Page 86  |  
Page 87  |  
Page 88  |  
Page 89  |  
Page 90  |  
Page 91  |  
Page 92  |  
Page 93  |  
Page 94  |  
Page 95  |  
Page 96  |  
Page 97  |  
Page 98  |  
Page 99  |  
Page 100  |  
Page 101  |  
Page 102  |  
Page 103  |  
Page 104  |  
Page 105  |  
Page 106  |  
Page 107  |  
Page 108  |  
Page 109  |  
Page 110  |  
Page 111  |  
Page 112