NORTH HYKEHAM ENERGY FROM WASTE FACILITY, LINCOLNSHIRE
The North Hykeham Energy from Waste Facility (EfW) was constructed as part of Lincolnshire Council’s strategy to reduce waste to landfill and provide a sustainable, safe and affordable waste treatment solution. The facility has been operational since 2014 and can treat 150,000 tonnes of residual waste each year.
The facility, visible on the Lincolnshire landscape near Whisby, called for a robust cladding solution that was durable enough to withstand the test of time and hold its aesthetics for many years to come. Built using Colorcoat HPS200 Ultra® pre-finished steel with Rockspan wall panels from Euroclad Group Limited, the facility was provided with an external façade that is not only long-lasting, robust and durable, but also delivers a visually striking appearance to the facility.
Find out more about the North Hykeham Energy from Waste Facility here 97