FIRE SAFETY


Case study


Grange University Hospital, Cwmbran, Wales


The Grange University Hospital is a new £350 m hospital in Cwmbran, Wales. This state-of -the-art facility forms part of a wider strategic plan which will see Aneurin Bevan Health Board significantly modernise its health service provision. Originally known as the Specialist Critical Care Centre, the 471-bed facility brings together more than 40 complex and more acute services onto one site and will serve over 600,000 people per year.


As a major healthcare project, main


contractor Laing O’Rourke commissioned Central Roofing South Wales Ltd to design and install the roofing and cladding systems – with ROCKWOOL providing the solution to meet the architect’s non-combustible specification. The site was operational in November


2020, much earlier than a previously announced date of 2021. This is due to construction programmes being accelerated to ensure the facility could be partially opened as a Nightingale (COVID- 19) Hospital, if needed.


The challenge Plans for the Grange University Hospital were finally given the go ahead in October 2016, with Central Roofing South Wales Ltd working to a façade design which specified PIR insulation on the external of the steel frame structure. By the time construction started in


July 2017, the architect upgraded the specification to non-combustible insulation. This left Central Roofing South Wales Ltd with the challenge of updating the design while minimising impact on the building footprint. In addition to fire protection


considerations, the building design also demanded that a U-value of 0.18W/m K be achieved in the through-wall construction. The use of non-combustible insulation was also a key requirement for areas of the flat roof, particularly in critical areas above compartment walls. Central Roofing South Wales Ltd highlighted that non-combustible insulation was needed to insulate the metal deck profiles. This was to provide effective protection in the event a fire started inside the building. As the architect upgraded the insulation specification to be non- combustible, the design had to be updated while minimising impact on the building footprint.


The solution Central Roofing South Wales Ltd revised the façade insulation design to incorporate dual-density stone wool insulation, which delivers acoustic, thermal and fire performance all in one solution. BBA certified, once installed the robust outer surface of the slabs, in combination with a factory applied water


repelling agent, acts to resist rain ingress during construction. For the firestopping, approximately


25,000 penetration seals were installed throughout the scheme.


The result The transition from PIR insulation to stone wool insulation is traditionally associated with an increase in wall thickness. However, leveraging intelligent system design with our expertise enabled Central Roofing South Wales Ltd to deliver a non-combustible façade build-up with just a 100mm increase in wall depth. “The Grange University Hospital is one of the largest projects we have delivered as a business. It proved a critical success factor that we could continue constructing the façade without having to protect the insulation as this saved us valuable time on-site – enabling us to complete ahead of schedule,” said Tony Davies, managing director, Central Roofing South Wales Ltd.


IFHE DIGEST 2024


63


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98