search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
HEALTHCARE FURNITURE


domestic environments, removing institutional references. Here furniture should be comfortable and high quality, as well as durable, safe, and light. Modern materials can increase durability and lightness, are safer, and offer unlimited options for creativity.


A more ‘transitional’ environment Furniture in waiting areas can support a more active and transitional environment – and can be designed to reflect the corporate identity of the healthcare provider in the use of colour and finish selection, as well as determining how comfortable the patients will be.


How to specify hospital furniture A thorough analysis of each department’s processes and patient flows at the outset is essential. Mock-up rooms can be developed by the manufacturer to help achieve the optimum clinical functionality and aesthetic design. Do also consider lifecycle costing; this is important to achieve long-term value, but is too frequently overlooked in furniture specification.


A good, specialist hospital furniture manufacturer will engage with the design and construction team at an early stage to develop the specification for manufacture, and ensure that the specific project requirements are met with as few deviations as possible. Glue and dowel construction for cabinetry and pre- assembled carcases will radically reduce work and the number of fitters on site, and should significantly improve quality. This type of furniture is also more durable to withstand the long-term rigours of a healthcare environment that may be in use 24/7.


One of a number of attractive kitchen units manufactured for the specialist Cambridge cardiothoracic hospital.


Benefits of UK supply


A UK-based manufacturer will provide continuity of supply, and reduces the risk of delays. Lead times should also be shorter, particularly in the supply of replacement products – and will support the UK manufacturing economy. New- build hospital projects typically have many variations in room layouts and more complex specialist items. This requires a high degree of project management to review the programme, manage manufacture, and meet the contractor’s stringent delivery schedule. Skilled, trained fitters should be closely supervised by the furniture supplier’s directly employed project manager to maintain the quality of fitting out. A track


record in healthcare is also strongly recommended, so the manufacturer can demonstrate a clear understanding of project requirements and detailed specifications – from producing compliant and accurate tenders, to developing designs that reflect best practice in infection control.


Case study –


Dumfries and Galloway Royal Infirmary More than 5,000 items of furniture were manufactured and installed by Deanestor in a £1.4 m contract for the new Dumfries and Galloway Royal Infirmary. Built by Laing O’Rourke, and designed by Ryder Architecture with NBBJ, the £212 m hospital provides high quality acute


YOUR MEDICAL GAS & VENTILATION TRAINING SOLUTIONS NEW PRACTICAL TRAINING FACILITIES IN YORK


HTM 02-01 Medical Gases


HTM 03-01 Heat & Ventilation


Authorised and Competent Person Training Courses Delivering HTM Training Courses to Over 90 NHS Trusts Since 2011 HTM 03-01 Compliant Operating Theatre and Ante Rooms Book now Across 2020 and 2021


Visit ppltraining.co.uk or Call 0333 121 0381 HEJ October Advert - Draft 2.indd 5


Delivering Excellence as Standard


18/09/2020 12:13 October 2020 Health Estate Journal 87


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108