The European Union’s Medium Combustion Plant Directive – Monitoring and Compliance Requirements
David Graham and Steve Griffi ths, Uniper Technologies Summary
that these do not qualify as a Large Combustion Plant under the Industrial Emissions Directive). Emission Limit Values are defi ned for NOx
and new aggregated plants above 1 MWth , SO2 ). In addition, the UK has extended the
The European Union’s Medium Combustion Plant Directive (MCPD) entered into force in December 2015 and this must be transposed into national legislation within each of the Member States by 20 December 2017. The MCPD applies to existing individual Medium Combustion Plants (MCPs) in the net thermal input range 1 to <50 MWth
(provided
scope of the MCPD to cover small electricity generating plants, designated as ‘specifi ed generators’.
and dust for conventional combustion plants and gas turbines and engines, excluding start-up and shut-down periods. These limits will be applied to new MCPs from 20 December 2018 and to existing MCPs from 1 January 2025 (> 5 MWth January 2030 (≤ 5 MWth
) or from 1
Periodic monitoring is required annually for MCPs > 20 MWth and three-yearly for smaller MCPs and all pollutants with specifi ed
Emission Limit Values and CO must be monitored. Optional exemptions are provided for MCPs that operate for no more than 500 hours per annum, district heating plants and isolated plants in remote locations and for those subject to interruption of their regular fuel supply. However, more stringent requirements can be imposed on MCPs within Air Quality exceedance zones.
There are signifi cant implementation challenges associated with the assessment and demonstration of compliance and also the suitability and scheduling of manual periodic measurements following plant registration or permitting.
12 2 Scope of the Medium
input is assumed to be based on the net calorifi c value of the fuel (the lower heating value) in line with other European legislation.
Combustion Plant Directive The MCPD nominally applies to Medium Combustion Plants (MCPs) in the thermal input size range ≥ 1 to < 50 MWth
. The thermal
Most stationary combustion plants are in scope of the MCPD, including boilers, engines and turbines, except for Large Combustion Plants (regulated under Chapter III of the Industrial Emissions Directive(IED) and waste incineration plants (regulated under Chapter IV of the IED). Mobile generating units covered by the Non-Road Mobile Machinery Directive are also exempt from scope.
Emission Limit Values (ELVs) are defi ned for nitrogen oxides (NOx
fi red MCPs (with the exception of gas oil). Only NOx specifi ed for natural gas and gas oil fi red MCPs.
), sulphur dioxide (SO2
) and dust for solid and liquid fuel ELVs are
A new plant is defi ned as an MCP that is put into operation on or after 20 December 2018 whilst an existing plant is an MCP operating before that date. ELV compliance is required from 20 December 2018 for a new plant and from 1 January 2025 for an existing plant (> 5 to < 50 MWth
) or from 1 January 2030 (≥ 1 to ≤ 5 MWth ).
Combustion Plant (LCP) status, a new MCP, which includes units smaller than 15 MWth
Existing MCPs are regulated as individual units whilst new MCPs are regulated as aggregated units at stack level. As the IED excludes units smaller than 15 MWth
when deciding on Large , may therefore aggregate to more than 50 MWth without being classed as an LCP.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108