Unit –


TERM 3: Formal assessment task: PAT


Scenario: A commercially viable ore body containing platinum group metals has been found on land belonging to a tribe in rural South Africa. Drill samples have proved that the reef lies at a relatively shallow depth only 500m below surface. A decision has been taken to sink a shaft to this depth to conduct bulk sampling on a small scale before deciding on a mining method best suited for the size and value of the resource. Your mechanical engineering company decides to submit a tender for the construction of shaft head-gear suitable to transport miners to and from the work level, and for raising ore and waste in loads not exceeding 10 tons at a time. Investigate: Lifting mechanisms (wire rope-driven mine head-gear) in use at South African mines for raising people and ore. Sketch: initial idea sketches to meet the requirements given in the scenario. Design brief with specifications and constraints.


Simulation: teams form mechanical engineering companies. They evaluate sketches of individuals and select the best idea for the team tender bid. Drawings for the shaft head-gear – each learner draws a: • 3-D isometric drawing of the selected design giving dimensions and drawn to scale. • 2-D working drawing showing one or more views with dimensions and lines. Budget: teams prepare a realistic budget detailing expected costs of constructing a real mine shaft headgear, detailing valid prices of materials and labour costs of the range of workers who would be involved in designing and building such a device. Make: teams build their working scale model using safe working practices.





Communicate: teams present their tender proposal for the mine shaft headgear (research, plans, flowchart, model and budget) to the “Tender Board”. Formal assessment task: Test


Learner’s Book page


124–127


Time


allocation (2 hours)


2


127–128


4


128 129–130


2 1


21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61