POWER CONVERSION HELPS TO BUILD THE FUTURE OF WIND POWER EFFICIENCY


Wind turbine developers will soon have open access to a £50 million testing facility in the UK based on unique and leading-edge technology. The state- of-the-art facility has been specifically designed for full-scale testing of large nacelles. GE’s Power Conversion (NYSE: GE) allows them to develop and build the next generation of wind turbines that will be increasingly efficient, reliable and cost-effective.


RENEWABLE ENERGY CENTRE (NAREC)


This wind turbine test platform is being built at Narec. It is designed to allow manufacturers to speed up the development time of their systems. In order to achieve this, a tailor-made, 35-meter-high, 3,000-sq.-meter facility to house the test rig was constructed on designs allowing it to be capable of handling the performance, endurance and compressed life testing of complete nacelles.


DIRECT-DRIVE PERMANENT MAGNET MOTOR


The installation that GE has designed and will commission is comprised of the direct- drive, permanent magnet motor, one of the first of its kind, which will run at up to 30 rpm and with a maximum force of 14.3 million NM (Newton Meter), resulting in a power of over 20,000 hp, which is equivalent to the driving power of 150 passenger cars.


GE is responsible for the turnkey package for the test facility from the grid supply to the motor shaft, including a heavy- duty, medium-voltage drive system and comprehensive automation and visualisation equipment, as well as overlooking the overall installation with the wind load simulator.


ENERGY TECHNOLOGIES INSTITUTE (ETI) INVESTMENT


The Energy Technologies Institute (ETI) is investing £25m in the Narec facility, through the design, development and commissioning of the test rig by GE Power Conversion and MTS Systems Corporation. It is a public-private partnership between global energy and engineering companies and the U.K. government to bring together engineering projects that accelerate the development of affordable, secure and sustainable technologies.


“GE also is responsible for supplying on- site and remote service and maintenance as well as developing new equipment for future projects. Similar to the LORC (Lindoe Offshore Renewables Centre) project, we are excited to take a leading role in a project that will improve tomorrow’s energy technologies.”


INVESTMENT FUNDING


Narec has invested more than £125 million of U.K. government, private sector and European Union funding to create an unique integrated portfolio of testing and research facilities for renewable energy, operated on an open-access commercial basis in Blyth, Northumberland, England.


TEST FACILITY


The Narec test facility is the largest independent open-access facility for the testing of wind turbine drive trains in the world. The FAS (Force Application System)


www.windenergynetwork.co.uk 111


Franz Hubl, Global Business Leader - test systems, GE Power Conversion, said, “Narec customers, regardless of where they are from, will soon benefit from this facility and the improvements that it will deliver in sustainable wind energy. We are well on the way to completing the installation and will train technical personnel very shortly.


is being provided by GE’s consortium partner - MTS Systems Corporation of Minneapolis. Its equipment is one of the largest in the world of its type and incorporates an unsurpassed hydraulic/ mechanical system to apply forces to the mechanical assembly of the wind turbine, as seen in the real installation, e.g. by wind forces at an offshore installation.


GE Power Conversion’s 15-megawatt permanent magnet motor


ON-SITE ASSEMBLY


The 15-megawatt permanent magnet motor, serving as the main driver to emulate the wind speed, with a rating of 20,000 hp, has been developed and supplied by GE, Rugby, and features superior dynamics in conjunction with the controls, supplied by GE, Berlin. Due to its mere size with a diameter of 8 meters and an approximate weight of 330 tons, it was assembled on-site. The pre-fabricated elements are being shipped to the Narec site and the remaining assembly work carried out in situ by GE.


GE Power Conversion www.gepowerconversion.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116