search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
CASE STUDIES


Aqua Cooling brings benefi ts to plastics recycling


H


ampshire cooling engineers went above and beyond their brief to help a new corporate client save thousands of pounds a year at its recycling plant in the north east of England.


Specialist engineering fi rm Aqua Cooling, which is based in Fareham and has an offi ce in York, has supplied and installed one of its hi-tech chiller systems for a prestigious new client at its Redcar waste management facility near Middlesborough. The system, which incorporates reserve free cooling capacity, not only features this capability as a failsafe but also has the potential to save the group, one of the UK’s leading integrated waste management companies, up to £40,000 a year in running and maintenance costs at its mixed plastics recycling plant in Wilton, Teeside. The company turned to Aqua after a series of chiller breakdowns caused by plastic debris in the cooling system condenser disrupted operations once too often. Aqua’s original brief was to supply a new system with similar specifi cations as a


56 December 2016


replacement but, when Aqua engineers arrived on site to assess the project, they realised their client could save thousands of pounds a year if they substituted a free cooling chiller system. Joe Konarski, Aqua sales and project manager, takes up the story. “It was incredibly interesting to go behind the scenes at a waste management recycling plant,” he said.


“The original chiller had broken down and would have cost a lot of money to repair — initially, we were asked simply to relocate and replace the old system like-for-like but, when we looked more closely at the existing set-up, we thought: actually, we can go further here and not only make the operation run more smoothly and effi ciently but also signifi cantly reduce running costs for this client.


“Our new system has now been working well for a year, and the client has just placed an order for a second free cooling chiller, so we hope to continue to work closely with this company in the future,” said Mr Konarski.


The recycling facility, which off ers an integrated washing and sorting service for recycled mixed plastics, relies on Aqua’s chiller to cool plastic waste, enabling it to be compacted as part of the recycling process.


In normal operation, the system passes heated water through a radiator that is cooled by ambient air — on hotter days when the ambient temperature is too warm to be an eff ective cooling agent, the free cooling chiller kicks into action to boost the system.


Aqua’s free cooling chiller system is highly effi cient, cost-eff ective, and environmentally friendly; it is expected to save the waste management group up to £40,000 a year.


By incorporating free cooling technology into the system, Aqua off ers a failsafe capability to ensure its system can remain in operation even if the chiller develops a fault, allowing isolated maintenance to be carried out without requiring a complete system shut-down.


www.acr-news.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64