This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
case DC cable deployment, when considering EMF, can therefore be assumed to be 600kV cables separated by 50m. Again, it must be stressed that these are approximate, albeit informed, estimates and that modelling would need to be undertaken to ascertain more accurate figures should such cable designs be implemented.