This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
Burial of cables is proposed, where possible, to a depth of 0.5 to 5m, which will reduce potential effects of EMF upon marine fauna. Where burial is not possible (e.g. where cables cross pre-existing cables or over harder substratum), covering with rocks or mattresses will be undertaken.