July, 2015
www.us-
tech.com
Page 35 Lockbolt Fastener System from POP Avdel
Shelton, CT — POP® Avdel®, a registered trade- mark of Stanley Engineered Fastening, a Stanley Black & Decker Inc. Company, is introducing NeoBolt, a non-breakstem lockbolt fastening sys- tem for heavy-duty structural applications. The two-piece NeoBolt fastener has a collar and a pin with fine pitch locking grooves that, when in- stalled, provides excellent vibration resistance and fatigue performance. Unlike traditional lockbolt fasteners, there is
no pin break so there is no metal waste, and there is reduced noise. There is no installation shock, no risk of pintails being dropped into the application or work area, and no corrosion at a pin break sur- face. With no shock loads, tool life is extended and operator fatigue reduced. Apart from eliminating metal waste, the re-
duced pin weight and size versus normal lockbolts offers environmental benefits of using less raw ma- terial and less energy throughout manufacturing, shipping and storage. Designed for industries ranging
from rail, truck and trailer to mining, construction, commercial vehicles, and alternative energy applications, Neo - Bolt fasteners can withstand the stresses of the toughest applications and environments. The fasteners are quickly and easily installed in seconds to provide a secure, maintenance-free, long-lasting joint compared to tradi- tional nut and bolt assemblies. NeoBolt offers a permanent joint with far greater vibration resistance that avoids loosening by unscrewing.
PROMATION Completes Installation for Medical
Device Co. Kenosha, WI — PROMATION, Inc. has completed its second line installa- tion for a major medical device manu- facturer. The installation was an- chored by PROMATION’s EBL and
Lockbolt fastener system. To install the NeoBolt fastener, the pin is
placed through the materials to be joined and the collar screwed onto the pin thread with just a sin- gle turn. This collar “fit-up” feature enables easy pre-assembly in joints and avoids the need to sup-
port the pin during the subsequent swaging opera- tion. A tool with an open collet is placed over the pin tail end and when actuated, the collet closes and pulls the pin. The anvil moves onto the collar, closes any joint gaps, and swages the collar wall down into the pin locking grooves. Once full swag- ing load is reached, the tool travel stops and re- turns to release the pin. Radial bars on the collar flange, standard on
all sizes, further enable quick visual verification of full swage during installation or inspection. NeoBolt lockbolts are available in a variety of
sizes ranging from 3/16 to 1-in. (4.8 to 25.4mm) di- ameter, with a grip range from 0.520 to 6.23-in.
(1.3 to 158mm). Contact: Stanley Engineered Fastening, 4
Corporate Drive, Shelton, CT % 877-364-2781 or 203-925-2260 fax: 800-225-5614 or 203-925-2279 Web:
www.StanleyEngineeredFastening.com
Clean room gets new line instal- lation for medical products.
EBU clean room magazine handling systems designed for Auer magazines. These systems offer a smallfoot print with lots of capacity, holding up to 10 magazines (5 up and 5 down) with storage to the rear of the machine. Magazines are bar code validated as they enter the elevator for orientation and trace-ability, while carriers are also read and traced as they flow through the systems. Other inspec- tion, interconnect and buffering sys-
tems were added to complete the line. Contact: PROMATION, Inc.,
9522 58th Place, Kenosha, WI 53144 % 262-764-4832 fax: 262-764-4837 Web:
www.Pro-mation-Inc.com
See at SEMICON West Booth 5662
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88