BIM is about the information about the building


possible, lessons can be learnt from what works well, and this knowledge can influence future projects, refurbishment works and maintenance activities. UK Government has adopted an


approach of selective investment to drive the creation of standards and protocols necessary to create a common BIM operating environment. This ‘push’ element creates the infrastructure of tools, processes, standards and training necessary to deliver top class BIM and combined with the Government’s ‘pull’ element - a known and predictable demand by for BIM derived data on all projects, this firmly places the UK construction industry at the forefront of BIM. But the 2016 deadline is just a stepping stone. Looking beyond 2016, the Government has a 2025 Industrial Strategy that is aiming to maximise efficiency in the construction industry through legislation and best practices aimed at: l Lower costs – 33% reduction in the initial cost of construction and the whole life cost of built assets. l Faster delivery – 50% reduction in the overall time, from inception to completion, for new build and refurbished assets. l Lower emissions – 50% reduction in greenhouse gas emissions in the built environment. l Improvement in exports – 50% reduction in the trade gap between total exports and total imports for construction products and materials. This strategy requires the continued use and development of BIM throughout the construction industry. Tools are developing rapidly, processes are changing


ABOUT NBS


Now in its 40th year, NBS is the trusted source of specification, product information, BIM and practice management solutions for the UK construction industry. Their specification system is already recognised as the UK de facto standard. Today, the expertise with which they have developed standards for BIM objects means that these too are fast becoming the recognised industry standard in the UK. NBS services are at the heart of


coordinating information about an asset. NBS Create is their latest revolutionary specification system which was developed for BIM. The award-winning NBS National BIM Library is the primary source of free-to-use BIM content in the UK and is now also used internationally. The website enables construction professionals to locate, download and use thousands of high quality, data-rich generic and proprietary BIM objects, all of which have been authored to the trusted NBS standard. NBS BIM objects have direct connectivity with the key BIM 3D design tools and can be directly integrated into the NBS BIM specification software, NBS Create, which gives NBS a unique position not just in the UK but the world.


NBS is at the very forefront of BIM development and their experts hold key positions in the groups and organisations that are shaping the UK BIM landscape and starting to attract interest on a global stage. NBS is a member of the BIM Technologies Alliance, which supports the Government’s Construction Strategy BIM Working Group, and is also represented on key groups such as the BSI 555 BIM standards committee, CPI, ICIS and buildingSMART. They also publish the internationally respected National BIM Survey which is now in its fourth year.


122 GLOBAL OPPORTUNITY 2014 | ISSUE 01


and this will all lead to better value for money and better buildings. Software technology will take care of itself but effort needs to be placed on the all-important ‘I’ in BIM. Without well organised, comprehensive and connected content the opportunities available with BIM will not be realised. Information must flow from work stage to work stage; the information must be consistent, comparable, capable of being validated and importantly it must be sharable. BIM-enabled working allows information to be shared by different project participants and also between different stages of design, construction and operation. This requires changes to the definition of traditional architectural phases, more data sharing than project teams are used to, and a willingness to embrace partnering in an approach that collects all project related information digitally. BIM doesn’t stop when a


building is handed over. The UK Government’s soft landings project is all about collecting information and analysing it during the in-use phase. Is the building performing as designed? Are the energy targets being met? Using soft landings, lessons learned can be fed back into the briefing process for new projects; this is how clients, design teams, contractors and manufacturers can truly benefit from BIM. The “I” in BIM is vast and there


can never be too much information; but at project level, it’s making the information concise and work hard that is crucial. BIM is about avoiding information loss and encouraging information accumulation through the normal project stages. In time, the construction sector will move from a focus on information collection to information connection. Connected information will lead to insight, and analysis will lead to prediction. And that’s when buildings become intelligent and far greater value from the asset can be achieved.


GO


FURTHER INFORMATION Find a wealth of free BIM information on thenbs.com and nationalBIMLibrary.com Follow us: @thenbs


global-opportunity.co.uk


ARCHITECTURE & DESIGN


|


BIM


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200