MARLINS PARK THE FIRST LEED®
GOLD CERTIFIED
RETRACTABLE-ROOF FACILITY IN THE WORLD AND
RECENTLY RANKED #1 ON AMERICA’S TOP 7 ENERGY-EFFICIENT BASEBALL STADIUMS*
ENGINEERING POS SIBI L I T I ES L EE SL ADE, P.E. | +1 80 0 . 3 6 4.73 0 0 | WWW.WA LT
ERPMOORE.COM
STADIUM-REL ATED SERVICES INCLUDING STRUCTURAL ENGINEERING, STRUCTURAL DIAGNOST ICS, PARKING AND TRAF F IC CONSULTING
*PUBLISHED BY THE ALLIANCE TO SAVE ENERGY, 10 / 11/ 12
Mar l ins Park | Miami, Florida, USA © 2012 Chr isty Radecic
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53