Editor’s choice
TAKING A SYSTEMS APPROACH TO SOLVE ELECTRIFICATION
CHALLENGES Industrial organisations can push decarbonisation forward by shifting process heater systems from fossil
fuel-burning to electric. This kind of electrification needs to be done with a systems approach in mind - by considering the entire thermal loop. Of all the components needed to switch to electric, control panels are one of the most important. For large-scale applications, control panels need to be designed to maximise reliability, accessibility and safety. In this article, Jeff McClanahan, business segment leader at industrial technology company Watlow, explores why systems approach thinking is key in the manufacturing of components for electrification.
he question of electrification is less of an if or a when, and instead how. Globally, companies are prioritising the reduction of their carbon footprint. There is a huge push across different industries to “go electric” as part of a larger program of decarbonisation. But the details for doing so can be elusive. It is not as easy as swapping out gas- fired heaters for electric heaters, for example, without also considering the size, location and connectivity of the control panel that will regulate those electric heaters. These considerations will, in turn, have a bearing on how and when the system needs to be maintained, how long downtime lasts and what the prospects are for future expansion. The point of a systems approach is to take a step back, seeing how different design considerations impact on the system and process might have as a whole, rather than focusing on the functioning or replacement of a single part. A systems approach also has an impact on the business aspects of an industrial process, as it encourages engineers to consider the total cost of ownership when comparing different options.
T
MEETING CHALLENGES AT SCALE Taking a systems approach to process heating was a foundational consideration behind the design of Watlow’s L and XL WATCONNECT control panels. Here, we take a deeper look at
14
what went into that design as a way of illustrating the power of this kind of thinking.
A systems approach means finding not just one or two solutions to meet a challenge, but finding as many solutions as possible to optimise a given outcome. Take reliability, for example. What are all of the different ways a system can be optimised to ensure near 100 per cent uptime? One way this was done in the design of the WATCONNECT panels was by looking at the thermal design of the system. All systems generate some heat, and excess heat is the nemesis of electronics. Therefore, optimising the system to keep heat under control is critical. Watlow’s design looked at adding to the insulation of the system, reducing power where possible, and improving the airflow throughout the system. Airflow itself was improved by using high- reliability EC inlet and outlet fans with advanced monitoring, which provide up to twice the airflow compared to industry standard fans. Therefore, by better controlling waste heat within the panel, Watlow can extend the life of the electronic components and significantly increase reliability. Other design considerations include accessibility options. A smaller panel door in the unit provides access to 90 per cent of the system while still shielding the user from high-voltage components. This allows a person to troubleshoot the system while running, and without the safety
concerns that come from opening the panel while “hot.” This also ensures longer uptime, as the panel does not necessarily need to be shut down for investigating smaller issues. WATCONNECT panels are also designed with solid copper internal power interconnect for less expansion and contraction. This is especially important at high-resistance junctions, because the more this component heats up when made from an alternative to copper, the higher the risk of failure. Lastly, while the panels are categorised as large, they use only 50 per cent of the space that competitive panels require. This can make it easier to install the panels when space is limited. Or, if replacing current equipment, the savings potentially frees up space for other critical equipment, allowing for future expansion.
September 2023 Instrumentation Monthly
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102