search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
The Vallarta HQ building also features 78 offices, 166 workstations, eight conference rooms and collaboration spaces


TAKING THE LEAD


Tat ethos led Ricca to develop a training area within the test kitchen to allow Vallarta to bring in offsite staff from stores and use a small training facility to test out a range of equipment and menu items to be served out of store cafes. Doing that, says Carver, fits with the drive towards creating a multifunctional space that should deliver much more value in the long term. Seeing that vision through on a project


with many other aspects – the Vallarta HQ build also features 78 offices; 166 workstations, collaboration and focus spaces; eight conference rooms; six focus booths; and a variety of open lounge spaces and communal gathering tables throughout the space – demanded a laser-like focus on delivering on the foodservice brief no matter what the pressures were. “Tis is something I learned from


working with various industry leaders: as foodservice consultants, we need to take a lead. And I find a lot of us take a step back, and by doing so we’re not the best advocate for our foodservice professionals or those operating that environment,” he says. “So, when we got into discussions


with mechanical engineers, for instance, who might try to push and pull on us a bit we stood firm: here are the core guiding principles for this project, so we need to find a way.” Whether that centered around the


decision to go all electric or the need to meet a certain volume of meals delivered per day, Carver and his team were determined to maintain the primacy of good foodservice practice no matter what the technical or engineering challenges facing the project were. “Being a driving force was so


Passing the test


important. I think every project builds upon itself; so with every design we do it’s a collection of our experience that we can bring together to help the client be even more successful, because that’s a value we bring as consultants.”


35


THE AMERICAS


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70