ENERGY
The regulatory / standards landscape: HTM, BS, and NHS requirements We have been providing standby generator solutions to the healthcare sector for over forty years. Our team is clear that the starting point for design, installation, and operation in healthcare is HTM-06, with some of the key expectations including: n Standby generators must be able to pick up load within a defined timescale after mains failure, with UPS or other secondary power sources covering the very short interval.
n Single or multiple generating sets can be configured in various configurations, augmented by a fuel system, control system, exhaust system, appropriate levels of attenuation, and – above all – must be reliable, supported with rigorous maintenance regimes.
n Generators must be capable of handling the required load, achieve prescribed first level load step acceptance and large surge loads such as motor starts, HVAC, etc. while maintaining voltage/frequency within prescribed limits.
Generator exhaust gas flue system.
Scope 2 emissions, as the Trust is directly responsible for consuming the electricity and heat generated on site, usually from natural gas. This, however, needs to be set against the alternative of importing electricity from the national grid.
Grid supplied electricity in the UK is produced from a
Generators installed in a hospital plant room.
diverse mix of gas, nuclear, and renewables, but once transmission and distribution losses of around 7–8 per cent are factored in, its effective carbon intensity at the point of use rises. Under ISO 14064, those upstream generation and distribution losses are reported as Scope 3 emissions for the consuming trust. By generating power locally and using waste heat, a fully integrated CHP system can achieve overall efficiencies of over 80 per cent, significantly higher than the 35–45 per cent net efficiency typically realised by grid electricity delivered to site. The result is that, while Scope 2 emissions may appear higher for the trust operating a CHP, the system wide emissions footprint (Scopes 1–3 combined) is often materially lower than relying solely on grid imports. This distinction is crucial for healthcare estates teams: carbon accounting must not only focus on how emissions are categorised, but also on the true whole system efficiency that underpins resilience and sustainability.
n Many manufacturers and specifiers often find that some HTM requirements do not align exactly with how commercial diesel generating sets are designed or tested.
The regulatory environment is tightening: environmental legislation, emissions standards (Medium Combustion Plant Directive MCPD), and carbon reporting, plus the NHS has its own Net Zero commitments, and public expectations are becoming increasingly influential. These things themselves do not render diesel standby generation obsolete, but they do influence how it is considered internally, how it is specified, deployed, and operated.
Why standby diesel generation remains crucial The journey to Net Zero is forcing a fundamental rethink of how energy is generated, distributed, and consumed. As we move closer to a Net Zero future, government policy remains focused on: n Reducing fossil fuel use across the economy. n Scaling up renewable energy sources such as wind, solar (PV), and nuclear – diversifying our energy mix.
n Electrification of transport, domestic, and industrial heating.
n Electrification of energy hungry processes such as steel and concrete production.
All of these will add massively to electrical demand while altering the way in which that additional energy is both produced and distributed. Speaking in 2024 about the growing power demand, National Grid chief executive John Pettigrew spoke about: n The potential for a six-fold increase in data centre energy consumption in the coming decade, which poses a real threat to network stability.
n That the grid was becoming “constrained” and “bold action” was required to create a network able to cope with “dramatically” growing demand.
n That “future growth in foundational technologies like AI and quantum computing will mean larger scale, energy-intensive computing infrastructure”.
He also noted that much of the UK’s high voltage ‘super grid’ is over 70 years old, and that to reach Net Zero by 2050, the operator must: n Upgrade infrastructure to meet higher consumer demand.
56 Health Estate Journal September 2026
WB Power Services Ltd – a Rehlko Company
WB Power Services Ltd – a Rehlko Company
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136