search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SLUICE ROOMS


Sluice rooms generate humidity and odour. Proper extraction is essential to maintain negative pressure where required to ensure air-borne bacteria does not enter other areas. Again, this must be engineered early.


When a room is poorly designed, staff are forced to improvise. Improvisation leads to shortcuts, and shortcuts increase the risk of infection. To avoid this, construction teams should observe clinical workflows during the design phase, gaining insight into how the space will actually be used.


n Reputational damage. n Expensive remedial works.


Common compliance failures include:


n In operable layout. n No dedicated hand wash basin. n Inadequate space for separation. n Domestic-grade finishes. n Poorly maintained or incorrectly installed Bedpan Washer Disinfectors. n Lack of ventilation.


For developers working to tight commercial timelines, failing inspection due to preventable design oversights is entirely avoidable. Early collaboration with infection control


advisors, equipment suppliers, and specialists, mitigates this risk.


Margot Glover


Margot Glover is the current managing director of Stanbridge Limited, a leading provider of infection control solutions. Joining the company in 2008 as business development manager, she became sales director in 2010 and assumed overall responsibility of the company in 2019. With a strong background in sales and business growth, Margot is also deeply passionate about training and delivering infection control and prevention programs. Her expertise in this field has been instrumental in driving Stanbridge’s mission to improve healthcare standards, ensuring the company remains at the forefront of innovation and quality in infection prevention & sustainable methods of disposal.


Engaging specialists at design stage Sluice room specialists understand the spatial and service implications of equipment selection. Engaging the services of our specialists early can provide you with: n Accurate room planning: ensuring every piece of equipment fits seamlessly while maintaining accessibility and safety.


n Confirmed service requirements so plumbing, electrical, and drainage needs are identified and integrated from the outset.


n Workflow-optimised layouts designed to minimise staff movement, reduce contamination risk, and streamline daily operations.


n Clear compliance alignment guaranteeing that all installations meet current healthcare and regulatory standards.


n Reduced redesign risk saving time, cost, and frustration by avoiding last-minute changes during construction or refurbishment.


Waiting until procurement stage removes flexibility and limits options.


The operational perspective: designing for staff efficiency A well-designed sluice room is not just about passing inspections; it is about making life easier for the staff who use it every day and the safety of the residents and patients. An efficient layout: n Reduces unnecessary movement. n Minimises manual handling risks. n Speeds up turnaround times, which allows for more time dedicated to patient care.


n Encourages correct hygiene practices. 174 Health Estate Journal October 2026


Lifecycle thinking: beyond initial installation and planning for the long term When selecting equipment, it is important to think beyond the initial installation. A sluice room should be designed not just for day-one functionality, but for years of safe, efficient use. Consider factors such as durability, ease of maintenance, and adaptability over time. Ask questions like: n Can the bedpan washer or other equipment be serviced without tearing down walls?


n Are valves, isolation points, and service connections easily accessible?


n Will the materials stand up to repeated exposure to cleaning products over a decade or more?


n Is there flexibility to replace or upgrade equipment as technology or clinical needs evolve?


By planning with the full lifecycle in mind, you reduce future disruptions, avoid costly retrofits, and ensure the room continues to support staff and patient safety for years to come.


Designing only for day-one compliance is short-sighted. Designing for lifecycle resilience protects the client’s investment.


The commercial case for early planning Planning sluice rooms early is not just good practice; it makes financial and operational sense. Early integration can: n Reduce costly changes and redesigns. n Streamline commissioning and handover. n Lower overall project risk. n Help contractors demonstrate proactive infection control.


In competitive tenders, showing that you understand how the room will actually function (and not just what the drawings say) can set your bid apart. Today’s healthcare clients expect contractors to appreciate operational realities, ensuring the facility works efficiently from day one.


Elevating the status of the sluice room Infection prevention begins with environment. The sluice room may be out of sight to patients, but it is central to safe care delivery. For contractors, architects, and developers working in hospitals, the lesson is clear: do not leave sluice room design to the end. Integrate it at concept stage. Plan the workflow. Confirm utilities early. Specify robust materials. Install mandatory equipment correctly. Design for compliance, durability, and efficiency. When the sluice room works properly, no one notices.


When it does not work properly, everyone does. By proactively addressing the design of a sluice room


within the planning stage of a hospital build, you can be sure you are delivering a compliant build that exceeds your clients’ expectations and safeguards the long-term operation within the facility, and provides a foundation which, with the appropriate ongoing maintenance, will aid infection prevention and control for many years.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188