ROOF REFURBISHMENT
Before (top) and after images of the roof of Milton Keynes University Hospital.
None of that was luck. It came out of what the survey established before anyone specified anything, which is where the rest of this article goes.
What the targets require, and what has to deliver them Two sets of numbers frame every roofing decision on an NHS site, and they pull in opposite directions. The first is the target. Under Delivering a Net Zero
NHS, the NHS Carbon Footprint – covering emissions the service controls directly – is committed to Net Zero by 2040, with an 80 per cent reduction between 2028 and 2032. The wider NHS Carbon Footprint Plus follows by 2045. Those are not aspirations sitting in a strategy document. The Health and Care Act 2022 placed duties on Trusts and integrated care boards to have regard to climate change in the decisions they make, and the NHS Net Zero Building Standard has applied to upgrades of existing facilities, not just new builds, since October 2023, bringing whole life carbon reporting into the business case. The second is the condition of what has to deliver it.
The 2024/25 Estates Returns Information Collection put the cost of eradicating backlog maintenance in England at £15.9bn, up 15.7 per cent in a single year, with the high risk element rising 28 per cent to £3.5bn. Backlog is measured against condition B, the minimum acceptable standard. Not good, not fit for the next 25 years. So that figure is the cost of getting back to acceptable, and each year it is deferred the same work costs more and moves up a risk band. The point where those two meet is the building fabric. NHS England’s five year progress report shows estates emissions down 10 per cent since 2019/20 and emissions
104 Health Estate Journal October 2026
from grid electricity down 21 per cent, largely because the grid itself has decarbonised. Gas, which accounts for around 40 per cent of the NHS carbon footprint and is mostly heat, has fallen by 1 per cent over the same period. Electricity has been getting cleaner without Trusts having to do very much. Heat will not. That is the case for treating roof renewal as a decarbonisation project rather than a maintenance one. A roof that has to be replaced anyway is one of the few moments when a Trust can improve fabric performance, add generation, and clear a backlog liability from the same access and the same programme. Miss it and the next opportunity is 25 years away. Flat roofs defer well, right up until they do not. Nothing
visible happens for years and then a great deal happens at once, usually in the middle of a winter storm and usually above something clinical. A roof does not stay a roof problem for long. It becomes a decant, an infection control conversation, and an emergency capital request, in that order.
The roof: what a survey has to establish Two questions decide what the money buys, and both should be answered before either the roofing or the solar scheme is specified.
n How much service life is left The first is decided by evidence rather than appearance. Core samples show whether the insulation below is wet
or dry, and that single result decides whether the existing build-up can be overlaid or has to come off. An overlay leaves the existing construction in place and applies new waterproofing over it, which removes the strip-out cost, removes the waste stream, shortens the programme,
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188