search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
September, 2018


www.us-tech.com


Naprotek Installs optical control Component Counter


San Jose, CA — Naprotek has pur- chased and successfully installed an optical control OC-SCAN® CCX.3 SMD counting machine for control-


exact inventory knowledge, the com- pany has increased its productivity. Monitoring and controlling in-


ventory is critical for the production process. The CCX.3 X-ray system simplifies the electronic manufactur- ing work and gives exact precise con- trol of inventory, and as a result, helps keeps lines running. The CCX.3 component counter


accommodates reels, tubes, JEDEC trays, and cut strips. Its average cycle time is approximately ten sec- onds. This reduces Naprotek’s manu- al counting time to nearly zero, with


only minimal loading and unloading by the operator. Each item is dis- played on the screen with the associ- ated count, and the operator can in- crease the field of view to double- check and assure accuracy of individ- ual parts being scanned. The addi- tion of this machine reduces the han- dling and manual counting of parts, giving Naprotek a massive increase in throughput in the material, kit- ting and receiving process. The new unit provides cutting-


edge capability for the company’s stockroom and greatly enhances its


material handling process. Some of its key advantages are the lack of any programming requirements and ease of use. What used to take hours to count now can be counted in min- utes, saving valuable time that can be devoted to other, critical inventory management tasks, and giving Naprotek the ability to reconcile in-


ventories for its customers Contact: Naprotek, Inc., 90 Rose


Orchard Way, San Jose, CA 95134 % 408-830-5000


E-mail: lmorrissey@naprotek.com Web: www.naprotek.com


Page 35


OC-SCAN CCX.3 X-ray component counting system.


ling inventory in the stockroom. Naprotek strives to set a standard for high-quality prototypes and made-in- America production. With access to


KwikTic Exhibits New Smart Factory Software


Wigan, UK — KwikTic has released a number of new features to enhance its smart factory MES software, in- cluding KwikScheduler, a stand- alone, integrated production schedul- ing and tracking module. Kwik - Scheduler allows the user to plan across multiple lines, sequential route steps and multiple processes for a range of product groups. The program organizes production plan- ning, while providing real-time progress feedback. Not only for SMT, the software


is useful across a range of industries, including manual assembly, mechan- ical and box build assembly, test, packing, etc., guiding operators with simple correct paperless instructions at the right time to boost efficiency and reduce mistakes. Real-time performance, pro -


gress and quality information is pre- sented through a range of dash- boards and drill-down reports. The software is designed to be easy to use and foolproof, for a more reliable process throughout. Features that include paperless travelers and work instructions help to ensure that the correct information is in use at all


times, simplifying version control. Contact: KwikTic, Ltd., 10-12


Upper Dicconson Street, Wigan, Lancashire, WN1 2AD, UK % +44-0-1942-366216 (U.S.) 857-366-5656 E-mail: info@kwiktic.com Web: www.kwiktic.com


See at SMTAI, Booth 525


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124