search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
WHAT’S NEW?


ENERGYS GROUP DELIVERS EFFICIENCY IMPROVEMENTS FOR WALTHAM FOREST


EDUCATIONAL FACILITIES The energy-saving potential of a large primary school and adult learning centre in the London Borough of Waltham Forest have been transformed thanks to a significant installation of the latest Energys lighting and boiler control technologies.


The new solutions – which were financed via Salix through client and site owner/ operator Waltham Forest Council – have also remedied long-running sensor inadequacies and failure problems associated with previous systems.


The starting point for the project was Energys’ approach to Waltham Forest Council’s energy team with information about the long-term cost savings that could be obtained with its latest lighting and boiler control ranges, as well as the relatively short payback period that could be achieved with even the most extensive deployment. As it turned out this proved to be a very timely conversation as the council’s energy manager, Andras Kis, was already considering the potential of new technologies to reduce expenditure at both the Edinburgh Primary School and co-located Adult Learning Centre (ALC).


“We were also experiencing issues with the efficiency of the existing lighting and occupancy sensors, with regular failures occurring at both the primary school and the ALC,” said Andras. “Lights were often coming on at the wrong time, or were remaining on all the time, leading to considerable inefficiencies. Despite the fittings only being about seven years old, we were starting to incur hefty replacement costs as well as expenses related to maintenance and support.”


Through conversations with the Energys team – who produced detailed forecasts and specification sheets for projected site-wide installations – Andras and his team were assured that the new solutions would make an enduring difference to their facilities’


10 | TOMORROW’S FM


energy consumption patterns. Consequently, a two-phase programme of work was devised to take place during school breaks in early 2018, ensuring a minimum of disruption to personnel and regular activities.


Comprehensive upgrade


At both sites the final specification drew on a broad cross-section of current Energys solutions, with an understandable emphasis on high- efficiency LED-oriented products. The latest LED light fittings were installed widely, in conjunction with motion/occupancy sensors to make sure that lighting was only used when and where it was required – something that certainly hadn’t been the case with the previous lighting systems and sensors.


The project was extensive and covered all areas in the school, including the sports hall, gym, dining halls, kitchens, laboratories,


staff rooms, classrooms, storage areas, toilets and corridors. The new Energys installation also included the latest outdoor and emergency lighting products, replacing ageing systems that were either technically outdated or no longer in warranty. Meanwhile, the deployment at the Adult Learning Centre spread over two floors and encompassed offices, classrooms, reception areas, a cafe and a canteen.


With the programme of work now fully complete, both sites can look forward to payback periods that are expected to be in the region of five years, as well as significant annual savings of approximately £12,000 across the school and Adult Learning Centre. Not only will these new systems bring lasting reductions to annual energy expenditure, they will also play a crucial role in minimising the sites’ carbon footprints.


www.energysgroup.com twitter.com/TomorrowsFM


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74