ADVERTORIAL
MEETING TIGHT DEADLINES
Efficient planning, a skilled work force and the right screeds are the absolute key to stay ahead of the ticking clock – as proven by screeding contractors CSC Screeding Ltd, with their record delivery of on time screeding for well- known logistics company, Kuehne and Nagel. When the initial project deadline had been set as one week, CSC’s forward planning and efficient team work saw the project completed in less than five days; well ahead of the estimated finish date.
With three screed pumps in operation on the site for the majority of the project, and an additional screed pump as back up, CSC ensured the smooth completion of the project, taking every possible step to prevent delays from unexpected eventualities.
Having been in the industry for over 25 years and having been part of some of the most prestigious construction projects in the UK, including the 2012 Athletes Village, Wimbledon Central Court,
Dublin Airport Terminal 2, London’s One Hyde Park and the London Bulgari Hotel – CSC Screeding firmly believes there are no short cuts to achieving quality. CSC Managing Director, Spencer Warner, also known as the ‘Screed Scientist’, commented: “Careful planning, attention to detail and the flexibility to accommodate unexpected plan changes are the key when handling projects on a tight deadline. The screeder should have a thorough understanding of what can be achieved under the given time constraints, and of course make sure the right screed is chosen for the project.”
Fast drying floor screed FlexiDry F3 was used for the Kuehne and Nagel project and was installed at a thickness of 75mm over 2,500sqm of underfloor heating.
www.cscscreeding.co.uk
An advanced and highly adaptive fast-drying screed
FlexiDry – a fl oor screeding solution that saves you time and money:
• Accelerated dry times of 3 days with F0, 7 days F1, 14 days F2 and 21 days F3.
• Foot traffi c after 12 hours
• Drying times are NOT dependent on a controlled environment
• No curing under polythene – removes health and safety risks
• Higher compressive strength
For an accelerated dry time of 3 days
For an accelerated dry time of 7 days
For an accelerated dry time of 14 days
For an accelerated dry time of 21 days
The perfect partner for underfl oor heating
• Dimensionally stable
• Excellent thermal properties
• Reduced running costs
Tel: 0845 555 5656 Email: info@fl
exidry.com www.fl
exidry.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64