34
Expert Help Available for the Implementation of ISO 9001:2015 Revisions
Changes to ISO 9001 were made in 2015. All ISO 9001 certified organisations have a 3 year transition period to update their quality management systems accordingly. If your processes involve any weighing steps, Mettler Toledo can support you to easily make the necessary updates, using the proven risk-based Good Weighing Practice™ approach. Do you need help to be ready by September 2018?
ISO 9001 is a standard that sets out the requirements for a Quality Management System (QMS). Its aim is to help businesses and organisations
be more efficient and improve customer satisfaction. ISO 9001:2015 was released in 2015 and certified organisations have to adapt their processes to meet these changes by the September 2018 deadline. Greater emphasis is placed on the process approach, and risk-based thinking is now an important focus. Continuous improvement can be achieved by implementing the recommended Plan-Do-Check-Act (PDCA) cycle. But how do these elements relate to weighing?
Weighing has a critical impact on product quality. Quality is directly related to the accuracy of weighing results, and that accuracy is determined through calibration. A company is obliged to ensure that every balance or scale used in the weighing process is accurate enough to achieve the intended results.
To adopt the latest revisions to ISO 9001 for any processes which involve weighing, Mettler Toledo can support you to make the transition straightforward. Proven and well-established Mettler Toledo expertise, Good Weighing Practice™, was founded on the risk-based thinking approach. The elements which need to be considered for the PDCA cycle are already defined and fully developed within the GWP® Verification packages, making it easy to ensure that any weighing processes are ISO 9001 compliant.
Recommendation and GWP®
Mettler Toledo’s ISO 9001 library collection for resources and support to learn more about this topic. Content such as white papers and on-demand webinars are available for download.
These free resources are designed to help you understand the scope of the ISO 9001:2015 changes, explain the implications on weighing processes, and provide guidance and recommendations on how to implement risk-based thinking with respect to weighing.
43757pr@reply-direct.com
Top Loading Autoclave Perfect for Taller Loads
For laboratories looking to sterilise tall items such as fermentors and large capacity Erlenmeyer flasks, or have a high-density load requirement but have limited floor space, latest version of the Priorclave C60 top loading autoclave (
http://www.priorclave.co.uk/products/top-loading- autoclaves/) could prove to be the perfect choice.
Designed and built by one of the UK’s leading autoclave manufacturers, the Priorclave compact C60 autoclave with its 60 litre stainless steel chamber can accommodate easily ten one-litre or sixteen 500ml bottles, alternatively six one-litre Erlenmeyer flasks. This highlights the versatility of an autoclave requiring just 472 x 620mm of floor space.
Through the push-button Tactrol® 2 microprocessor control system users easily programme the
sterilising parameters of time and temperature as well as select special features such as free- steaming and media warming. Free steaming can improve air removal in difficult loads and/or reduce temperature lag between the load and the autoclave, reducing process time at higher temperatures. The media warming feature cycles the temperature between approximately 45º to 55ºC once the factory pre-set temperature of 45ºC is reached, which continuous until the door is opened. This allows, for example, nutrient media to be held as a liquid until it is needed, especially when used along with the delayed start function.
Access to the sterilising chamber is gained through the patented Quickseal single-action door closure/opening mechanism which is designed for one handed operation and incorporates thermal and pressure locks that prevent opening at unsafe temperatures and pressure to prevent personal injury.
This versatile C60 top-loading autoclave range is available as a standard design or as a vacuum model, both versions are electrically heated with the elements contained within the actual chamber for faster and more efficient build-up of high-temperature, pressurised sterilising steam.
Also, the autoclave is equipped with castors it enables it to be easily moved when required and the fact that it plugs simply into a 13A socket to power-up, the Priorclave C60 top loading autoclave is one of the easiest and fastest to install.
Priorclave has incorporated Biomaster Protection into the exterior epoxy coating, a highly effective and permanent treatment for control of harmful bacteria, making any surface cleaner, more hygienic and providing durable lifelong protection against the threat of cross contamination.
43395pr@reply-direct.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128