search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
[INDUSTRY NEWS] The hoist, with 36 ft. of lift, positions the


grapple as required to remove debris from three wells that have the same diameter but varying depths. It removes waste product and discards it multiple times per shift in line with operations. Bradley Ross, zone operations manager


at HCSG, said: “Very few hoists can actually carry out this type of work and ACCO built it as a tailored product for this particular application. The issue that can arise is that pulp and paper accumulates on moving parts of the grapple, as well as any parts that are in the tank. This could include the load block of the hoist, which regularly utilizes wire rope sheaves that rotate as the hook is raised and lowered. “The pulp and paper collecting on


the sheaves and wire rope will jam in the load block of the hoist, potentially causing damage to the moving components. If enough debris is collected, the load block could fail.” Clay Soverns, service manager at


HCSG, said: “The solution was to design a


hoist where the load block had no moving components and as few debris collection points as possible. ACCO achieved this by modifying its standard reeved hoist design into a winch with only a load bar for the grapple at the end of the wire ropes. While debris will still collect on the load bar, there are no moving parts for it to create a jamming scenario.” Eric Weber, product manager at ACCO,


explained that the ends of the wire ropes had to be fitted with attachments for connection of the spreader bar to the grapple. HCSG utilized swaged clevis fittings, facilitating easy installation and removal of the grapple from the hoist when needed for maintenance. Weber added: “With the wire ropes


coming off of the drum and not returning to the hoist to share the load with a dead end, we had to reconfigure the unit to accommodate the entire load solely on the drum.” The 2.5-ton capacity ACCO hoist


provides plenty of leeway with even the heaviest of grapple loads only reaching approx. 1.25 tons. y


Jason West Joins CIS Rigging as National Sales Manager for Electrode Handling Division


> Contractors & Industrial Supply, Inc. (CIS), an industry leader in specialty industrial rigging and crane services, announces the addition of Jason West to its management team. As the new National Sales Manager for the CIS Electrode Handling Division, West will work together with steel mills worldwide to help them identify their equipment requirements, and institute the safest working environment possible for their employees, particularly in melt shops. With more than 20 years working in the


steel and related industries as both a supplier and a melt shop operator, and a degree in steel technology from Northeast Community College, Jason comes to CIS with a wealth


THERE’S AN EXPERT BEHIND EVERY LIFT


TEST, INSPECT, CERTIFY, RENT, REPEAT


LGH sets the bar when it comes to equipment safety and reliability. With vertical and horizontal proof testing equipment, certifi ed and experienced technicians on site at each of our rental locations and reliable processes in place for each piece of gear in our fl eet, no equipment is safer or more reliable than equipment rented from LGH. With 23 North American Rental Centers, the gear you need is just a phone call away.


(800) 878-7305 Rentals@RentLGH.com www.RentLGH.com/WRE


WIRE ROPE EXCHANGE


MARCH–APRIL 2020


9


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93