This page contains a Flash digital edition of a book.
Moorings 4000/Leopard 40
Morrelli and Melvin have become partners
explains, ‘has helped us win more
in a very different way to when the
production boat design contracts.’ In the
company was forged. While Gino Morrelli,
beginning, Melvin, on the other hand, was
who from the start had more hands-on
the one who figured out how to engineer
practical experience building and designing
strength and speed into their designs. Since
multihulls, concentrated on the conceptual
then (1992), the company has grown into “
No one seems to
mind the ability to
design work, Gino now focuses on product
a much larger team with many ongoing
sail fast. You can
development. A lot of builders didn’t have
projects. Now Pete’s daily role is to manage
a product development team to help get
always slow down
the design office and contribute to ongoing
the product out into the assembly line.
design work. a fast boat, but you
Expensive and time-consuming mistakes
were being made. ‘Essentially this means
More details from: www.morellimelvin.com
can’t speed up a
working with our production builder clients
slow one!
to refine designs, tooling, and production
methods to improve production efficiency
and quality.’ ‘The diversification,’ Melvin

  MAY 2009 : MULTIHULL REVIEW  27
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47
Produced with Yudu - www.yudu.com