This page contains a Flash digital edition of a book.
SHOP SOLUTIONS


technologies allow easier programming and faster, more accurate machining. But more important to Kalkman are the machine’s automation capabilities. Its optional large spool capacity allows loading of wire spools weighing up to 55 lb (25 kg) to enable untended operation for extended periods. “We can leave on Friday and not come back in until Monday and know there is plenty of wire to do the jobs we have sched- uled,” Kalkman said. An even more signifi cant advance for untended op- eration is AgieCharmilles’ Pilot Expert 4 remote machine monitoring and control capability. Using a camera and Internet-based software, the system allows JK employees to remotely access the machine and programs using PCs and other mobile devices. JK’s wire EDM technician demonstrated the capability using his mobile phone. “I can change from screen to screen on the control,” he said. “I can monitor operations, I can edit a program fi le. The package allows panning and zooming of


PRECISE REAL-TIME DATA


IMPROVED VISIBILITY THROUGHOUT THE ENTERPRISE


QUALITY CONTROL AND SHOP-FLOOR TRACKING


TM


the camera images, resulting in true remote machine moni- toring and control capability all through a cell phone.” Kalkman recalled one job that ran completely untended on the CUT 300 Sp, a run of 60 lifter pockets with varying angles. “Those parts had pretty specifi c tolerances, and from the fi rst one to the last one there was less than 0.0001" [0.003-mm] difference,” he said. Another program ran un- tended for 130 hours nonstop.” For more information from GF Machining Solutions, go to


www.gfms.com/us, or phone 847-913-5300. Continued from P41


ERP System Tracks EDM Jobs, Grows Shop’s Business


W


hen you r job shop is running 80 electrical discharge machines (EDM), 24 hours-a-day with an output of


INCREASE ON-TIME DELIVERY


REDUCE CARRIED INVENTORY AND IMPROVE ACCURACY IMPROVE CASH FLOW IMPROVE SUPPLIER RATING


ON-TIME DELIVERY SUPPLIER PERFORMANCE Software & Professional Services


more than 5000 jobs a year, keeping track of every aspect of your business might seem impossible. But the team of Carl Sommer and his sons at Reliable EDM (Houston, TX) have not only kept track, but also managed to build Reliable into North America’s largest EDM job shop. Reliable does all forms of EDM: wire EDM, ram/sinker EDM, and small-hole EDM. They specialize nationwide in machining parts that no other form of machining can do, and some jobs even impossible for other EDM shops to pull off. Carl Sommer started in the machining trade in 1949 and has worked as a tool and die maker, foreman, tool designer, and operations manager of a large tool and die and stamping job shop. Carl with his extensive machining experience and his son, Steve, a mechanical engineer, are able to do unusual EDM jobs. For example, they modifi ed machines where they can wire EDM parts up to 62" (1575-mm) tall. They have also written the book, Complete EDM Handbook, which is used in colleges and trade schools.


SALES & PROFIT MARGIN


VISIT PROFITKEY.COM/ERP 888-6-PROKEY • info@profitkey.com


FOR A FREE DEMO 46 AdvancedManufacturing.org | June 2015


“Being in Houston, the energy capital of the world,” said Carl Sommer, “we do EDM work that requires costly large EDM machines. We’re not the typical job shop.” Ultimately, the goal for Reliable EDM is to EDM any needed part for their customers in the high-tech oil and gas industry, aerospace, defense, power generation, plastic, electronic, medical, as well as other companies throughout the U.S. To maintain the same growth that his father had spear- headed for the last three decades, John Sommer, the IT arm of Reliable, knew the company needed a new shop control


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208  |  Page 209  |  Page 210  |  Page 211  |  Page 212  |  Page 213  |  Page 214  |  Page 215  |  Page 216  |  Page 217  |  Page 218  |  Page 219  |  Page 220  |  Page 221  |  Page 222  |  Page 223  |  Page 224