relation to European or UK Protected Species and Habitats (The Conservation of Habitats and Species Regulations 2010; Wildlife and Countryside Act 1981), Protection of Badger Act, 1972.


212 An Ecological Clerk of Works (ECoW) will be appointed by EAOL. Their overall responsibility will be for ensuring that the planning conditions and the conditions of any licence granted are adhered to. It would be the duty of the Ecological Clerk of Works to monitor the implementation of the Ecological Management Plan and any relevant sections of the Landscaping Management Scheme.


213


The project EMP will include the measures to be adopted to communicate awareness of sensitive landscape features and ecological receptors to the project team and the procedures to be adopted in the event of an unanticipated encounter.


14 Archaeology and Cultural Heritage


214 A Written Scheme of Investigation (WSI) will be submitted by EAOL to the County Archaeologist in accordance with DCO Requirement 25. This document will not form part of the Code of Construction Practice, but a brief summary of their function and proposed content is given below. The WSI will identify any pre-, during and post- construction phase mitigation required in order to minimise impacts on buried archaeology. Any archaeological works or watching brief carried out under the scheme must be by a suitably qualified person or body.


215


The project EMP will include the measures to be adopted to communicate awareness of sensitive archaeological sites to the project team and the procedures to be adopted in the event of an unanticipated find.


15 Monitoring and Site Inspections


216 A monitoring programme will be established for environmental aspects associated with the project site, which will be documented in the construction EMP. The EAOL EMS and associated audit programme includes a requirement for EAOL or an experienced nominated delegate to audit EAOL construction sites on a periodic basis; included in the audit scope will be the appointed Contractor‟s monitoring and inspection regime.


217 As part of ongoing monitoring, EAOL will commit to data sharing and with statutory consultees where this is relevant (e.g. the results of coastal erosion monitoring).


Outline Code of Construction Practice. Version 3.


Page 61


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61