Code of Construction Practice – Subsidiary Plans Description


A Surface Water and Drainage Management Plan (see Section 11) will be prepared and implemented. The plan will include the approach to surface water and foul water drainage, and water supply during construction.


A Surface Water Drainage Scheme for Work No. 39 (see Section 11) will be prepared and implemented. The scheme will be compliant with Sustainable Drainage System (SuDS) principles


A watercourse crossing method statement will be prepared to cover each watercourse crossing


A Contamination Assessment and Mitigation Scheme (see Section 8) will be prepared to mitigation and limit impacts arising from the potential release of contaminants associated with Works 28 to 30 comprised in stage (vi).


A flood plan will be prepared and implemented.


A Noise and Vibration Management Scheme (see Section 6) will be prepared and implemented to minimise and mitigate noise and vibration emissions and will form part of the project EMP.


An Air Quality Monitoring Plan (see Section 7) will be prepared and implemented incorporating emission control measures outlined in best practice guidance.


An Artificial Light Emissions Management Plan (see Section 3) will be prepared and implemented. The plan will detail the appropriate mitigation measures to be taken to manage emissions from artificial light emissions.


A Written Scheme for the Management and Mitigation of Artificial Lighting Emissions for Works No. 39 will be prepared and implemented.


A Site Waste Management Plan (see Section 10) will be prepared and implemented. The plan will manage construction waste across the project in accordance with a waste hierarchy to minimise, reuse and recycle waste materials.


A Pollution Prevention and Emergency / Incident Response Plan (see Section 12) will be prepared and implemented to include measures to prevent pollution and those to be adopted in the event of a pollution incident including recording and response procedures in the event of a release of hazardous materials or fire.


A Project Community and Public Relations Procedure Table 1: Code of Construction Practice – subsidiary plans


DCO, Schedule A, Part 3, Requirement


Requirement 23, Requirement 27


Requirement 23 Requirement 27 Requirement 24


Requirement 27


Requirement 27, Requirement 29


Requirement 27


Requirement 28, Requirement 27


Requirement 28 Requirement 27


Supporting Requirement 23, Requirement 27


Requirement 27


Outline Code of Construction Practice. Version 3.


Page 11


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61