the site. The results will be compared to the most relevant Environmental Quality Standards appropriate.


195 Any environmental deterioration illustrated by the results would be highlighted. In the event of a potential pollution incident, all relevant monitoring points would be visited and re-sampled to determine any changes relative to baseline data. A report detailing the findings would be prepared for each incident and recommendations provided for further monitoring and / or requisite mitigation measures.


196


Following completion of the construction of the development, all sample points would be revisited, re-sampled and analysed for the full suite of analytical parameters and a further report prepared, assessing and discussing any impacts upon water quality throughout the construction process.


197 All information recovered during the monitoring process would be collated and an assessment made regarding the impact on the surface and groundwater of the construction activities.


11.10.3 Personnel


198 All personnel taking samples, analysing and reporting would be suitably qualified. The contractor would be appointed based upon evidence of previous relevant experience within the UK.


11.10.4 Other Actions 199


Residents will be provided with a suitable point of contact through establishment of a Communications Protocol, should they experience any problems with their Private Water Supply.


200 201


Regular progress updates will be provided to inform residents when works are likely to be undertaken in their Private Water Supply catchment area.


In the unlikely event that construction works lead to the temporary deterioration of a Private Water Supply, an alternative temporary supply of water will be provided (e.g. water tankered to property and provision of temporary drinking water storage tanks). Damaged filters will be replaced in the unlikely event that a Private Water Supply becomes contaminated with sediments.


11.10.5Monitoring 202


The mitigation measures described above will be monitored by the ECW throughout the construction phase as set out in the EMP. If non- conformity with any of the


Outline Code of Construction Practice. Version 3. Page 58


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61