Summary of areas of possible contaminated land close to or within the proposed construction area Site location Grid ref
Site ref
Access
during site walkover
Observations from site visit
Crossed by corridor/ substation site
Areas of artificial ground on both banks of River Deben
6312 2398 and 6307 2396
5+6 Y
West Bank - Flood defence wall / levee East Bank - Flood defence wall / levee Contamination unlikely, as flood defence bunds would not have been constructed from contaminated materials. Site not of contamination concern.
Areas of artificial ground on both banks of Martlesham Creek
6263 2472 and 6263 2475
12+ 13
Yes (restricted)
Small flood defence levee on north bank, approx 2-3m in height. South bank - no levee/ defence noted, reeds and salt marsh lead up to field edge, which then rises upwards to south. Contamination unlikely, as flood defence bunds would not have been constructed from contaminated materials. Site not of contamination concern.
The Great Eastern railway line, north of Martlesham
6263 2476
14 Yes
Railway embankment and 30'' dia cast iron pipe (leading to sewage works). Potential contamination near surface from railway, but HDD should avoid this. SI will identify impact prior to construction work.
Sand pit / 6194 17 Outline Code of Construction Practice. Version 3. Yes Northern end of former pit / landfill is
HDD to pass beneath these areas.
Requirement for site
investigation prior to
construction
HDD to be present in this location, for which site investigation will be completed
HDD to pass beneath these areas
HDD to be present in this location, for which site investigation will be completed
If contamination is encountered by SI prior to HDD, action can be taken to address this based on advice of the environmental consultant.
If contamination is encountered by SI prior to HDD, action can be taken to address this based on advice of the environmental consultant.
Likely actions required if
contamination is present
HDD to pass beneath these areas
HDD to be present in this location, for which site investigation will be completed
Yes Borehole
If contamination is encountered by SI prior to HDD, action can be taken to address this based on advice of the environmental consultant.
Method statements Page 29
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61