Ensure that suitable and sufficient resources, (including labour, materials, time and finances), are made available to effectively manage the health and safety requirements


Require that all those parties involved in the construction or operation and maintenance or demolition of our renewable energy generating projects (Client, Designer, CDM1 Coordinator, Principal Contractor and all other Contractors), fulfil their roles and responsibilities both legal and organisational to health, safety and welfare


Require that parties involved in our renewable energy generating projects have, where appropriate, a readily available, valid, suitable and sufficient Pre Construction Information document and Health and Safety Plan as defined in the Construction (Design and Management) Regulations 2007


Ensure that upon completion of construction activity a suitable and sufficient Health and Safety File is completed and transferred, where appropriate, to the ultimate owner


At this stage in the project a separate draft Health and Safety strategy has been produced for the project. This draft strategy is appended to the Marine Management Organisation (MMO) and Local Authority Statements of Common Ground (submitted during the Examination for EA ONE).


2.3 28 Construction Principles


The appointed EA ONE Construction Manager and associated management team will be responsible for implementation of the CoCP provisions, for monitoring and for ensuring that the various construction contractors are in compliance with these requirements. The practical implementation arrangements and responsibilities conferred to the construction contractors will be detailed in further management protocols to be developed, including the construction EMP and associated plans as identified in Section 2.1 above.


29


The provisions of the OCoCP/CoCP will be incorporated into the contracts for the construction of EA ONE, and will be required to be adhered to as a requirement of the DCO. EA ONE and its implementing contractors will be required to comply fully with the terms of the CoCP.


1


1 Co-ordinator required on projects falling within certain parameters as defined in the Construction (Design and Management) Regulations 2007


Outline Code of Construction Practice. Version 3. Page 14


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61