potential impacts of installing cables within trenches, and the potential impacts of pulling cables through pre-installed ducts.
21.
Further details on the proposals are available within the scoping report, on the East Anglia THREE website:
http://eastangliathree.eastangliawind.com/ 22.
Figure 1 shows the proposed red line boundary for the project, i.e. the area within which infrastructure will be placed. This reflects The Crown Estate lease boundary for the East Anglia THREE Offshore Windfarm, comprising the turbines and associated offshore infrastructure, and the offshore cable corridor.
23.
Figure 2 shows the indicative onshore cable route for the project and the indicative converter station site boundary; i.e. the area within which converter stations for East Anglia ONE, East Anglia THREE and East Anglia FOUR would be placed.
24.
Figure 3 shows a simplified representation of the East Anglia THREE Offshore Windfarm infrastructure – from the offshore components to the onshore converter station.
Report to Inform the SoCC September 2013
East Anglia THREE Offshore Windfarm Page 6
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41