4 COMMUNITY CONSULTATION


4.1 Consultation Objectives 38.


The main objectives of the East Anglia THREE community consultation are to:


Keep local communities informed about the project throughout the pre- application phase using a variety of consultation methods;


Help local communities gain a better understanding of what the proposed development is likely to mean to them; Enable local communities to feedback on, and thus inform, the proposals; and


Explain how comments raised have been considered during the development of the proposals.


39.


EAOWhas been consulting local communities on developments within the East Anglia Zone since 2010. Consultation with relevant local authorities during discussion for East Anglia ONE helped to identify the local community and determined the consultation methods that were deemed to be the most appropriate to ensure an inclusive process. This included the identification of hard-to-reach groups and ways of enabling these groups to access relevant information. As the East Anglia THREE onshore cable route follows the same route as East Anglia ONE, it is natural that the consultation for East Anglia THREE will build on the consultation undertaken to date. East Anglia THREE Limited believes that the consultation undertaken as part of the East Anglia ONE development reached all relevant groups, however we welcome further information on any gaps identified to ensure that we have an up- to- date list of stakeholders. Section 4.3 below sets out the local communities that have the potential to be significantly affected by East Anglia THREE.


40.


Following our principles of effective community engagement, East Anglia THREE Limited aims to ensure that consultation is:


Understandable and accessible - information on the project will be written in a clear and concise way and will be made available through a variety of means;


Early and ongoing – community consultation has already begun and will continue throughout the pre-application phase of the project. Specific opportunities for feedback will be provided at key stages;


Report to Inform the SoCC September 2013


East Anglia THREE Offshore Windfarm Page 14


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41