GLOSSARY AND EXPLANATION OF TERMS Consultation Report


A report which will be submitted alongside the DCO application for the project which explains how we have consulted statutory and non- statutory consultees and local communities and how we have taken their comments on board in the eventual design of the project


Collector Station


Collector stations will sit within the windfarm area, and comprise electrical infrastructure, connected to a fixed foundation. The wind turbines will be connected to the collector stations via AC inter-array cables. The collector stations increase the voltage, and will connect to converter stations via HVAC inter-array cables.


Converter Station (Offshore) Converter Stations will sit within the windfarm, and house the electrical infrastructure required to convert the voltage from HVAC to HVDC, to minimise energy loss during transmission. These receive voltage from the collector station and transmit to the onshore converter station via export cables. The converter stations are connected to a fixed foundation.


Converter Station (Onshore)


The East Anglia THREE onshore converter station will be located at Bramford, Suffolk and will convert voltage received from the windfarm (via the export cable) from HVDC to HVAC to connect to the National Grid.


DCO


Development Consent Order. This is the document which will be applied for by East Anglia THREE Limited from the Planning Inspectorate, which includes planning permission, as well as all other consents required to construct the project.


EAOW East Anglia Zone


East Anglia ONE East Anglia THREE


East Anglia FOUR


Ecological environment EIA


East Anglia Offshore Wind Limited


An area identified by The Crown Estate as suitable for windfarm development. East Anglia Offshore Wind Limited has the rights to explore the development potential of this zone.


The first project proposed within the East Anglia Zone


A project proposed for the second phase of development within the East Anglia Zone


A project proposed for the second phase of development within the East Anglia Zone


The ecological group of receptors within the EIA. e.g. ornithology


Environmental Impact Assessment. This identifies and assesses likely effects from the construction, operation and decommissioning of the project. An EIA is required by the planning regulations for projects of the scale of East Anglia THREE.


ES


Environmental Statement. The outputs of the EIA are compiled in an Environmental Statement. The ES includes a description of the existing environment, the impacts of the project, and impact mitigation.


Report to Inform the SoCC September 2013


East Anglia THREE Offshore Windfarm Page 26


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41