Other groups likely to be indirectly affected by East Anglia THREE include: Other port and harbour operators; Local suppliers and manufacturers; Local skills and training providers; and Local road users.


50. A full list of proposed consultees is included in Appendix C.


4.4 Identifying Potential Impacts 51.


At this stage of the project, we have identified the following potential impacts which may result from the proposed development:


4.4.1 Offshore Temporary impacts during offshore construction on marine mammals, fish and birds (e.g. disturbance from vessel traffic and underwater noise);


Impacts of the offshore turbines on birds during operation (e.g. displacement or collision impacts);


Impacts upon seabed ecology (e.g. due to the presence of turbine foundations and cables);


Local disturbance to sea users during construction offshore; and


Long-term changes due to the presence of offshore turbines potentially affecting shipping, oil and gas, fishing, radar and aviation and recreational users.


4.4.2 Onshore Impacts on people’s views associated with converter station development near Bramford;


Temporary impacts on local households, including increased traffic and noise, during construction onshore;


Temporary impacts on wildlife and birds during onshore construction;


Temporary impacts on landscape (hedgerows/trees) during onshore construction.


Report to Inform the SoCC September 2013


East Anglia THREE Offshore Windfarm Page 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41