This page contains a Flash digital edition of a book.
Export Cable FLO


Generator Self Build Grid Connection Agreement


Grid Connection Agreement Human environment


HVAC HVDC


Inter-array Cable LA


Landfall MW NPS


NSIP PEI


The HVDC export cables connect the offshore converter stations to the onshore converter station, and allow the transfer of energy produced at the windfarm.


Fisheries Liaison Officer


A Grid Connection Agreement for an offshore energy generator, where the project developer consents and constructs the electrical connection to the national grid network. This connection asset will be sold to a third party when the project is operational.


The agreement between an energy generator and National Grid that allows a project to connect into, and provide electricity to the national grid network.


The human group of receptors within the EIA. e.g. Landscape and visual impact


High Voltage Alternating Current High Voltage Direct Current


Cables connecting wind turbines to collector stations within the windfarm, and from the collector station to a converter station, for the transfer of energy produced.


Local Authority


The point at which the export cable reaches the shore. Megawatts


National Policy Statement. Government produced documents that outline reasoning for, and implementation of government legislation.


Nationally Significant Infrastructure Project, as defined in Part 3 of the Planning Act 2008.


Preliminary Environmental Information. A detailed technical document outlining the existing environmental conditions around East Anglia THREE. This document will include an assessment of impacts and proposed mitigation measures.


Physical environment Planning Inspectorate


The physical group of receptors within the EIA. e.g. coastal processes.


The Planning Inspectorate is a government agency with responsibility for examining the application for consent for Nationally Significant Infrastructure Projects (NSIPs) such as East Anglia THREE Offshore Windfarm.


Receptor


Red line boundary Scour protection


Sensitive component of the environment (Human, Physical, Ecological) that may be influenced by East Anglia THREE offshore windfarm.


The boundary within which the development will take place.


A mitigation measure used to minimise disruption to the sea bed caused by water movement near a structure, e.g. a wind turbine


Report to Inform the SoCC September 2013


East Anglia THREE Offshore Windfarm Page 27


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41