59.


This site provides information about the East Anglia Zone, its development and the Planning Inspectorate Consultation Process:


http://www.eastangliawind.com/default.aspx


60. A project website accessed via the East Anglia Offshore Wind website that is specific to the East Anglia THREE project and updated regularly:


http://eastangliathree.eastangliawind.com/ 61.


Please note that each of the projects currently being developed within the East Anglia Zone (that is, East Anglia ONE, East Anglia THREE and East Anglia FOUR) have their own project website and their own consultation record. Signing up to each project website is essential if stakeholders wish to be updated on all projects and/or submit any comments or questions.


62. The East Anglia THREE project website currently includes:


Details of the process(es) by which consent will be sought, including key milestones and timeframes involved;


An overview of the wider regulatory framework within which the application for consent will be made e.g. relevant authorisations, licences, permits and consents required;


Details of the EIA process, including the EIA scoping report, the Summary of Environmental Considerations – Onshore and Summary of Environmental Considerations – Offshore, and the Planning Inspectorate Scoping Opinion; and


The East Anglia THREE Statement of Community Consultation. 63.


All key environmental documents, e.g. the Scoping Report, the Preliminary Environmental Information Report and the Environmental Statement, will be available through the East Anglia THREE project website once published. Due to the nature of these documents, the file size is naturally large. Where a file is too large to be downloaded, stakeholders will be able to request a CD copy from East Anglia THREE Limited, via the project website, email address or telephone number provided below.


64.


The project website will provide information on Public Information Days and will include an email alert facility for subscribers to the site when consultation material has been issued or events have been scheduled and contact details for the project, enabling the project team to record and respond directly to stakeholders.


Report to Inform the SoCC September 2013


East Anglia THREE Offshore Windfarm Page 20


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41