Impact


Table 20.3. Worst Case Assumptions Parameter


Construction


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction Dust


Construction


Preliminary Environmental Information May 2014


Jointing pits Jointing pit spoil Cable trench spoil Residual spoil Lay-down areas


footprint of laydown area


Trenching area and depth


CCS sites CCS landtake


8 HDD locations required (7 along onshore cable route and 1 at landfall)


HDD compound landtakes (15 compounds)


Number of onshore cables


Converter station compound area and building volume


Duration of works


Landfall


Export Cables


244 pits, each 30m2 and 2.5m deep


38,888m3 N/A N/A 61 300m2 N/A 9


10ha (secondary) 15ha (primary)


Cables pulled through existing ducts


N/A 4


2.61ha 246,500m3


10 weeks 44 weeks Converter 55 weeks


192 pits, each 30m2 and 2.5m deep


30,600m3 154,416m3 36,034m3 N/A N/A


32.17km long x 0.8m wide x 1.5m deep each for up to four trenches


9


10ha (secondary) 15ha (primary)


8 HDD operations


Scenario 1


Scenario 2


3,750m2per compound 4


2.61ha 246,500m3


10 weeks 44 weeks 55 weeks East Anglia THREE Offshore Windfarm


Chapter 20 Air Quality Page 4


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48