Table 20.27. Summary of Projects considered for the CIA in Relation to Air Quality Project
Status
Development period
East Anglia ONE Application 2018 –2019
1Distance from EA THREE site (km)
0
Project definition
Offshore Windfarm Project
Project description available
East Anglia FOUR Pre-application 2021 –2022 0
Offshore Windfarm Project
Outline project data only
Sizewell C Pre-application Unknown 24.7
Nuclear Power Station
No project detail available
Bramford- Twinstead
SITA (EfW plant) Pre-application Unknown In construction
Present – late 2014
Potentially 0
0.5 Outline only
Energy From Waste Plant
1 Shortest distance between the considered project and EA THREE– unless specified otherwise.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 20 Air Quality Page 38
Complete / high Complete / high No No Low No Incomplete / low Yes
Project data status
Included in CIA Rationale
Complete / high
Yes
Construction would not overlap but consecutive disturbance possible. Operational and decommissioning impacts considered.
Construction would not overlap but consecutive disturbance possible. Operational and decommissioning impacts considered.
Sufficient distance from site to not impact on construction dust levels. Development traffic data includes future traffic growth.
Detail unknown
Sufficient distance from site to not impact on construction dust levels.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48