The sensitivity definitions are based on the assumption that the whole onshore electrical transmission route including access would undergo construction concurrently. However, it is likely that construction will be divided into multiple phases and therefore the number of receptors in close proximity to active works at any one time are likely to be less than those assumed for the purposes of the assessment.


20.6.1.1.4 Step 2C: Define the Risk of Impacts 85.


The dust emission magnitude and sensitivity of the area are combined and the risk of impacts determined using Tables A7-A9 in Appendix 20.1. The risks for dust soiling, human health and ecological sites are shown in Table 20.23.


86.


It should be noted that East Anglia THREE will employ embedded mitigation measures relating to construction dust. The IAQM construction dust assessment methodology does not include the consideration of embedded mitigation measures when determining the potential risk of dust impacts.


Table 20.23 Risk of Dust Impacts Potential Impact


Earthworks Dust Soiling


Human Health Ecological Sites


87.


High High High


High High High


Dust Risk Construction


High High High


Implementation of embedded mitigation measures will ensure that the risk of dust impacts is lower than those identified in Table 20.23. Embedded mitigation measures are detailed in Table 20.4.


88.


Step three of the IAQM guidance identifies the appropriate good practice mitigation measures required based on the findings of Step 2 of the assessment methodology. Step 2 of the dust assessment determined that there would be a high risk of dust soiling, human health and ecological impacts resulting from construction activities without the implementation of mitigation measures.


89.


The recommendations detailed below are taken from the IAQM guidance document, and are considered to be ‘highly recommended’ by the IAQM for sites with a high risk of dust impacts. The measures below would be undertaken in addition to those measures included as embedded mitigation within the scheme. Embedded


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 20 Air Quality Page 30


Trackout


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48