This page contains a Flash digital edition of a book.
Pollutant


Air Quality Objective Concentration


125 μg.m-3


To be Achieved By Measured as*


24-hour mean not to be exceeded more than 3 times a year


266 μg.m-3


15-minute mean not to be exceeded more than 35 times a year


20.4.1.2 Policy


20.4.1.2.1 National Policy Statements 25.


The assessment of potential impacts upon air quality receptors has been made with specific reference to the relevant National Policy Statements (NPS). These are the principal decision making documents for Nationally Significant Infrastructure Projects (NSIP). Those relevant to East Anglia THREE are:


 Overarching NPS for Energy (EN-1) (DECC 2011a);  NPS for Renewable Energy Infrastructure (EN-3) (DECC 2011b); and  NPS for Electricity Networks Infrastructure (EN-5) (DECC 2011c).


26.


The specific assessment requirements for air quality, as detailed in the NPS, are summarised in Table 20.6 together with an indication of the section of this chapter where each is addressed. Where any part of the NPS has not been followed within the assessment an explanation as to why the requirement was not deemed relevant, or has been met in another manner, is provided.


Table 20.6 NPS Assessment Requirements NPS Requirements


Any ES on air emissions will include an assessment of CO2 emissions, but the policies set out in Section 2 [of EN-1], including the EU ETS, apply to these emissions. The IPC (now Planning Inspectorate) does not, therefore need to assess individual applications in terms of carbon emissions against carbon budgets.


The ES should describe:  any significant air emissions, their mitigation and any residual effects distinguishing between the project stages and taking account of any significant emissions from any road traffic generated by the project;


 the predicted absolute emission levels of the proposed project, after mitigation methods have been applied;


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 20 Air Quality Page 9


NPS Reference PEIR Reference


EN-1 paragraph 5.2.2 Not Applicable to Assessment


31/12/2004 31/12/2005 *The way the Objectives are to be measured is set out in the UK Air Quality (England) Regulations


EN-1 paragraph 5.2.7 Section 20.6.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48