Housing supply | 12.0 Local Development Plan | 12.1


The Local Development Plan (LDP) was adopted in June 2015 and sets out the long term vision and strategy for East Renfrewshire up-to 2025 and beyond and the policies and proposals required to deliver this. Together with the Approved Glasgow and Clyde Valley Strategic Development Plan (May 2012), these documents form the basis on which all planning applications require to be determined. The LDP sets an all tenure housing supply target of 4,100 homes (3,200 private and 900 affordable homes) to be provided during the period 2009-2025.


The housing supply target set out in the Adopted LDP reflects the Approved Strategic Development Plan (SDP) (2012). The main housing evidence base is the Strategic Housing Need and Demand Assessment 2011 (HNDA). This needs assessment has been utilised to inform the proposed scale, nature and distribution of the housing requirement for East Renfrewshire.


The SDP is currently under review with a Proposed Plan published January 2016 for consultation. A refreshed Housing Need and Demand Assessment was prepared to support the Proposed Plan. The HNDA and Proposed Plan continue to highlight a clear level of need and strong demand for affordable and private housing in East Renfrewshire up to 2029. This updated HNDA will form the basis of housing requirements for LDP2.


New housing completions in East Renfrewshire | 12.2 Graph 39. Housing completions in East Renfrewshire by year (Source: Planning database)


100 150 200 250 300 350 400 450


50 0


409 325 299 269 191 164 117 109 84 69 105 116 169 190 156


Over the past 15 years, house building in East Renfrewshire peaked in 2000/01 at just over 400 units and then reduced significantly to a low of around 69 in 2006/07. The Scottish economy went into recession in the middle of 2008. Since 2010/11, housing completions have generally increased. Although there was


a reduction during 2014/15, Graph 41 shows completions are programmed to rise over future years with anticipated completions of 287 in 2015/16.


50 Planning for the Future of East Renfrewshire


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55