This page contains a Flash digital edition of a book.
text text


needs to improve throughout the marine industry as the risks to equipment caused by harmonic distortion are likely to increase significantly as variable speed AC electric motors become more widely used in ships. • Regular monitoring of electrical networks should be undertaken and monitoring equipment should be capable of detecting transient voltage spikes, resonances, and excessive


harmonic distortion levels. • Procedures need to be established to manage distortion levels in the event that power conversion equipment or harmonic mitigating equipment fails. • Machinery alarms should be regularly reviewed and prioritised so that the risk of the watchkeeper being overloaded with too many alarms and not noticing those from critical


systems can be minimised. • Queen Mary 2 experienced two brief power interruptions during routine maintenance, whilst at sea en route to Fremantle in February. All main lighting, essential services, safety equipment and engine/bridge control equipment retained power throughout, via the back- up power supply systems on board. Full power was restored with no impact on passengers.


Disney Cruise Line adds fourth ship


• Affordable and reliable marine systems


• Customer oriented tailor-made solutions for newbuildings and retrofits


• Electro-pneumatic tank level gauging and draft measuring


• High level and overfill alarm • Vapour emisson control


Disney Cruise Line took delivery of 130,000gt Disney Fantasy from Meyer Werft in Bremerhaven on 9 February. The ship was floated out of the enclosed building dock on 8 January and was moved along the Ems River on 21 January. Disney Fantasy was due to sail for New York on 16 February, with a refuelling call in Funchal, Madeira. Arrival in New York is set for 28 February and naming on 1 March. The maiden voyage is scheduled for 31 March from Port Canaveral, from where it will sail on seven-night alternating eastern and western Caribbean itineraries.


Full tank level cabinet


Phone: + 358 30 711 8210 E-mail: sales@scanjet.fi www.scanjetmacron.com


The interiors may have been significantly restyled for seven- day sailings, but the vessel remains technically the same as sistership Disney Dream, which set sail in January 2011. It was reported that the


ship suffered vandalism in early December while under construction, but Meyer Werft stated that all the damage had been repaired with no effect on completion or delivery. PST


www.passengership.info Passenger Ship Technology I Spring 2012 I 11


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100