This page contains a Flash digital edition of a book.
128 TECHNOLOGY / LIGHTING CONTROL CASE STUDY


All rooms and common area databases at the Saxon Boutique Hotel typically consist of a central DIN-rail control processor, light dimming and relay switching products, all linked up to the Saxon’s IP network.


BOUTIQUE EXPERIENCE


Crestron combines technology and luxury in the Saxon Boutique Hotel Villas And Spa. solution.


Voted the world’s leading boutique hotel, the Saxon Boutique Hotel, Villas and Spa in Sandhurst, Johannesburg, is renowned for its state-of-the art conference facilities. The luxurious refurbished hotel contains the Nelson Mandela Platinum Suite, three Presidential Suites, and 20 ‘Egoli’ suites. Additional accommodation is provided in three newly built five-star Villas, containing several Egoli Suites, Presidential Suites and spa treatment rooms.


When the Saxon underwent renovation and extension, it sought the same level of integration and control throughout all common areas and private suites – including all in-room entertainment, lighting and air- conditioning systems – on a single platform. The Saxon wanted a one-remote-per-room solution and a unique look and feel for their rooms. They contacted Johannesburg- based, CKR Consulting Engineers to provide recommendations to meet their needs. CKR evaluated the requirements and specified that all equipment – automation, CCTV, fire detection, IT, and AV – should be controlled by a fully integrated single-platform control


Systems Integrator, Electrosonic SA was asked to demonstrate the capabilities of an integrated Crestron hospitality solution. As a member of the global industry association Hotel Technology Next Generation (HTNG), Electrosonic understands and meets the challenges the hospitality industry faces. Their control solutions seamlessly integrate with property management systems to monitor and control all room technology, while enabling staff to provide the highest level of personalised service to guests. CKR selected Crestron as the control solution due to its understanding of hospitality industry requirements, plus the design and flexibility, and versatility of their keypads. Panavision were then brought in as the installer and integrator of the project. “The integration of all the products was easy because Crestron had all the required modules for the products that needed to be integrated,” said Claude Jardim of Panavision. Pre-wiring commenced in November 2009 and consisted of Cresnet, control and


Ethernet cable.


When guests arrive at Saxon, they find the lighting, air conditioning, TV and music pre- set for the time of day, temperature and mood, with automatic background music playing and the TV serving as a welcome screen.


The room pre-sets are controlled via Crestron RoomViewTM to communicate with all Crestron processors for central monitoring and control. A major part of the project was the lighting. Electrosonic pre-designed, pre- manufactured and pre-tested all lighting distribution boards which made the installation seamless.


All rooms and common area databases typically consist of a central DIN-rail control processor, light dimming and relay switching products, all linked up to the Saxon’s IP network.


Electrosonic designed the system around Crestron’s DIN rail mount product range due to its outstanding ease of installation, use, maintenance and cost-effectiveness. www.crestron.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148