CONNECTORS & CABLES FEATURE THREE TIPS FOR TESTING CABLING


Matt Collins, business development manager at ide Systems, provides tips to help engineers test cables effectively to ensure they are fit for purpose


continuity. This test involves de- energising the cable and connecting an electrical tester end to end to determine if a complete circuit can be made. This is an essential step as it tests the


continuity of phases and earthing in the cable and ensures that the internals of the cabling are wired correctly. If a cable fails this test, it cannot be used reliably in a live application and must be removed from service, rewired and then retested.


W


hile we may like to think of the modern world as being wireless,


cabling remains an important element in almost all electrical systems. It is therefore essential that engineers know how to test cables effectively to ensure they are fit for purpose. It was in the early days of the twentieth century when renowned inventor and electrical engineer Nikola Tesla first conceived of wireless power transmission. Tesla’s idea was to erect a radio tower that could draw electricity from a power plant in Niagara Falls and transmit it wirelessly around the world. He described this as being “the motive power and thought transmitter of the near future”. More than a century later, wireless


power transmission has not quite lived up to Tesla’s promise. Instead, the increasingly electricity-reliant equipment and systems of today still require the use of cabling to receive power. Yet this is only possible if the cable is in a suitable condition and fit for purpose, as a damaged or compromised cable run is unsafe and ineffective. It is therefore essential that engineers understand what to look for when inspecting and testing a cable. As a temporary power distribution specialist, ide Systems’ rental service supplies cabling to everything from music festivals to commercial facilities — which understandably means that some are returned in a poor state of repair. As such,


engineers need to go through a three-step process of ensuring that cabling, whether it is single or multi-core, is fit for purpose.


VISUAL INSPECTION The first and most obvious step is to visually inspect for any signs of damage to the insulation of the cable and the plug and socket connectors. For temporary applications, the most common observable types of damage are slashed, shredded, crushed and cracked connectors. However, not all types of damage are


immediately identifiable. While it is easy to spot a slashed cable, many engineers may observe factors such as dirtiness as little more than an aesthetic problem. In reality, a mud-soaked cable may be indicative of ingress of water in the cable run, which can pose a health and safety risk.


ELECTRICAL CONTINUITY TESTING If a cable passes the visual inspection, it must then go through a series of dead tests to be tested for electrical


FIT FOR PURPOSE TESTING The final stage is to test the cable to ensure it is fit for purpose, which ide Systems does with both insulation resistance and a live test. Conducting an insulation resistance test, otherwise known as a megger, is critical in ensuring the cable is fit for purpose. It tests the current leakage through the conductor’s insulation material and, in doing so, tests are compliant to the BS 7671 wiring regulations. Engineers connect an insulation resistance tester to the cable, select the test voltage and are then provided with an electrical reading. A high reading is a pass, as opposed to a low reading which indicates a problem such as water ingress, loose connection or damaged cable. Even though cabling in outdoor


Matt Collins, business development manager at ide Systems


applications should be appropriately IP- rated to protect against water ingress, this can change with use. If an IP-rated cable runs through the mud of a festival for extended periods of time, it may experience some level of ingress. Once dead tests have been carried out and all test results have been recorded, only then will the engineer safely connect the cable to a known live supply to carry out the live test. The cable is energised and a phase rotation metre is connected to the one end of the cable. The engineer must then check that the


phase rotation metre is displaying the correct sequence of neon lights, which indicates that the test is now correct and complete. Only then can it be marked as “ready for hire”. While Tesla was correct about a great


It is essential that engineers understand what to look for when testing a cable





many things, wireless power transfer has not yet proven itself effective enough to be considered among them. Until that day comes, engineers must ensure that cable runs are fit for purpose and safe for use.


ide Systems idesystems.co.uk


INSTRUMENTATION | SEPTEMBER 2017 27


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80