REPAIR AND REFURBISHMENT Ӏ CASE STUDY
Eletronuclear needed the 4600 to complete the construction. However, Angra 3 has experienced multiple delays, meaning the crane had been parked outdoors for almost six years. During this time, it suffered severe corrosion damage due to direct exposure to rain, extreme heat, and the salty coastal sea winds. Eletronuclear carried out a cost-benefit analysis to identify if it was better to refurbish the crane or bring in a new machine. Bruno Bertini, head of the electromechanical assembly department at Eletronuclear, said: “The savings from rebuilding the 4600, compared to renting another crane, were crucial. “Additionally, having Manitowoc,
the manufacturer, lead this project gave us the reassurance to go for a complete and certified renovation,” Bertini said. “We knew that it would be a big challenge, but throughout the process we saw Manitowoc’s commitment to the quality of the service provided.”
EXTENSIVE PROJECT The full refurbishment took 22 months and involved 12 experts from Manitowoc’s EnCORE programme, located in both Brazil and the USA.
In addition to replacing parts and components, the EnCORE team updated the crane’s operating system and installed a modern load monitoring system, providing the operator with the information they need to work efficiently. Ricardo Cunha, product
support manager at Manitowoc in Brazil, said: “As we disassembled the equipment, we needed to replace parts of the structure and more than 600 critical components, including motors, pumps, valves, and sensors. Some of these parts were not easy to find – it is a unique crane that was mounted in a ring construction.
66 CRANES TODAY Over 600
critical components were replaced
It was more economical to refurb the old crane than rent a new one
There are not many others like it in the world.” However, this uniqueness also made the 4600 so vital to the project. The crane’s main boom is positioned on the ringer, supporting the counterweight. The configuration ensures greater lifting capacity in larger operating envelope when compared with other similar cranes. For Angra 3, this enables the crane to erect parts weighing up to 80t at a height of 42m and a radius of up to 60m. “Because of the ringer configuration, the 600t-capacity Manitowoc 4600 crane can lift very heavy metal parts used to
construct the plant’s reactor from a long distance,” added Ricardo. “If they had opted for new mobile equipment, they would have to use a crane with much higher capacity to carry out the same task.” The crane is a legend in the Brazilian lifting industry and its restoration is a point of pride. “This is the largest and oldest machine in our yard,” said Bruno. “It is part of the history of Angra NPP. We often receive nostalgic messages from former operators asking about the crane’s renovation and when it will work again. It is fantastic to see it fully renovated, ready to return to work.”
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87