Florian Peters, senior product manager – AT Cranes, Manitowoc, answers our questions about the new Grove GMK5150L-1e and GMK5150XLe.
What have been the biggest engineering challenges in developing the GMK5150XLe and GMK5150L-1e? When we revealed the GMK4100L-2 in late 2022 it was just a concept, so to advance that to a serial production machine required a lot of intense design and testing. We are actually unveiling a bigger machine than our concept and in two versions: the GMK5150XLe and the GMK5150L-1e. These machines have completed extensive testing to assure the high reliability levels that our customers expect. The cranes also have a more sophisticated design than the concept GMK4100L-2 we showed at Bauma 2022. We have adapted and optimised our assembly processes
to produce the new cranes, and we’ve put in place all the necessary measures to ensure full service and parts for customers. As always, some of the most challenging aspects were in the finer details of the crane. For example, we developed a ‘mature’ battery management system with heating and air conditioning conducted by a super-efficient heat pump. And to make the operation of our new hybrids as easy as
possible, we also integrated a generator into the driveline to allow charging while driving. These might not sound like major challenges, but they actually take a lot of fine-tuning – to precisely program when the battery needs to charge and how much. And the result is a success – an extremely efficient drivetrain which allows great flexibility in charging.
What prompted the upgrade from four axles, as seen on the concept, to five axles as seen on the debut models? There was a hugely positive reaction to the concept GMK4100L-2 hybrid at Bauma 2022. We spoke with many customers from around the world who were keen to make the concept a reality. These discussions also showed us that there was greatest demand for a machine in the 150 tonne category. The Voice of the Customer process is an integral part of our new product development and so naturally our discussions informed the next stages of development.
40 CRANES TODAY There are numerous factors which
make the GMK5150L-1e and the GMK5150XLe the perfect size for this exciting electrification project
How do these plug-in hybrid cranes differentiate themselves from the competition? We can’t comment on what other manufacturers are doing. Our motivation for this project is the needs of our customers, driven through our Voice of the Customer process. We certainly believe we have the best overall hybrid
crane solution. We say this because we offer the flexibility to charge
the battery pack either from the grid (with either AC or DC supplies) or through the built-in generator, removing any concerns customers have about charging infrastructure. So if there is no charging infrastructure at the customer’s depot or on the jobsite, the journey to and from the project can still be used to recharge the 180 kWh battery pack. The battery pack can accommodate a full working day without any compromises in performance. Even if the crane handles several jobs a day, recharging is unlikely to be required at the jobsite. And if grid charging is available at the jobsite, the crane can operate while being charged.
What are the key differentials between the two models? Are they suited to similar or different applications? The difference between the two hybrid models are the same as for the traditional diesel-powered equivalents. So the only differences are in boom and jib length and the hybrid cranes will generally work in the same applications as the diesel models, but then they will also be able to serve environmentally-sensitive jobsites, or projects where noise levels or vehicle emissions need to be restricted, such as in city centres.
Where, globally, will they be available and where do you expect take-up to be greatest? The cranes are being made available in all global markets. But we also see some key markets for these cranes, where there is a stronger focus on low emission cranes.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87