search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Franco Oboni & Cesar Oboni [10] Oboni, C., Oboni, F., 2022, Optimizing mitigation of tailings dams portfolios, TMW 2022, Denver.


[11] Azam, S. and Li, Q., 2010. Tailings dam failures: a review of the last one hundred years. Geotechnical news, 28(4), pp.50-54.


[12] Gloor, M., Halter, G., Oboni C., Oboni, F., 2022, Impact of climate change projections on tailings dams survivability, CIM 2022, Vancouver, Canada.


[13] Oboni, F., Oboni, C., 2016, A systemic look at tailings dams failure process, Tailings and Mine Waste 2016, Keystone, Colorado, USA


[14 ] Oboni, F., Caldwell, J., Oboni, C., 2016, Ten Rules For Preparing Sensible Risk Assessments, Risk and Resilience Mining Solutions.


[15] Comar, C., 1987, “Risk: A pragmatic de minimis approach.” In De Minimis Risk, edited by C. Whipple, pp. xiiixiv. New York: Plenum Press,


[16] Wilson, A.C. & Crouch., E., 1982, Risk/Benefit Analysis; Ballinger Publishing Company, Massachusetts.. pp.92-93;


[17] Renshaw, F. M., 1990, A Major Accident Prevention Program, Plant/Operations Progress 9, no. 3 (July), pp.194-197


[18] Molina, T., 1990. CSNI Workshop on PSA Applications and Limitations (No. NUREG/CP-0115; SAND- 90-2797; CONF-9009346-). US Nuclear Regulatory Commission (NRC), Washington, DC (United States); Sandia National Lab.(SNL-NM), Albuquerque, NM (United States).


[19] ICOLD, U., 2001. Tailings dams–risk of dangerous occurrences, lessons learnt from practical experiences (bulletin 121). Commission Internationale des Grands Barrages, Paris, 155.


[20] Oboni, C., Oboni F., 2013, Factual and Foreseeable Reliability of Tailings Dams and Nuclear Reactors -a Societal Acceptability Perspective, Tailings and Mine Waste 2013, Banff, AB , November 6 to 9.


[21] Oboni, F., Oboni, C., 2022a, A case study on ALARP optimization, Tailings 2022, Santiago de Chile.


[22] Cueto, I., Ledesma, O., Oboni, F., 2024, Incorporating Lifespan Considerations into ALARP Decision- Making for TSFs: A Novel Methodology, TMW 2024, Vancouver.


196 | Dam Engineering | Vol XXXIII Issue 3


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100